Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-RES-1025-04832
Parcel: 122153310

Address:
3222 E SENECA ST

Review Status: Requires Resubmit

Review Details: ADMINISTRATIVE v.1

Permit Number - TC-RES-1025-04832
Review Name: ADMINISTRATIVE v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/08/2026 PDSD Application Completeness Express REQUIRES RESUBMIT If you have questions regarding this request, please email PDSD-Permits@tucsonaz.gov

Prior to issuance of the building permit, the following items need to be completed.
1) Please pay the fees that haven been invoiced on the flood plain permit TE-FPU-0126-00014. Once the fees have been paid, the flood plain permit can be issued.

2) On the building permit, one of the following is required:
a) A contractor with an active Arizona Contractor’s License for the applicable scope of work, OR
b) A completed and signed Owner-Builder Affidavit (OBA).

The Contractor and/or Owner must be shown as a contact on the permit, and each must have a TDC Online account in order to be added as a contact.

Instructions on updating the contacts if a Contractor needs to be added:
https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf

Instructions on adding the Contractor Registrar of Contractors (ROC) license number if needed:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/contractor-roc-license-number_040826.pdf
OR
The Owner/Builder Affidavit can be found here if the owner is signing:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/owner-builder-affidavit_073025_fillable.pdf

Step-by-Step instructions on how to resubmit:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf

3) After the above two items have been completed, please submit a comment response letter notifying us. We will then invoice the remaining fees on the building permit and issue it once the fees are paid.