Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-1024-06250
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/06/2024 | Site Zoning | APPROVED | |||
| 11/26/2024 | Site Engineering | NOT REQUIRED | |||
| 10/30/2024 | Site Landscape | NOT REQUIRED | |||
| 12/06/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/08/2024 | Residential Building | REQUIRES RESUBMIT | Permit Review TC-RES-1024-06250 (8618 E 4TH ST TUCSON, AZ 85710) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC). 1. Show the function of the room inside the main house where the door was removed. Existing bedrooms with removed windows or doors must show code compliance for egress, R310. Foundation: 2. Show/clarify the footing as continuous under all new exterior walls, R403.1. Roof framing: 3. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing (closed cell spray or rigid board tight to the roof sheathing), R806.5. This condensation control provision is necessary for code compliance and may be a single layer of air-impermeable insulation or layered with batt insulation for achieving the total required roof R-value (R-30 for addition <20%). 4. Show a minimum roof R-value of R-30, N1102.1. Electrical: 5. The overhead service conductor over the structure requires an 8’ clearance above the roof, E3604.2.1. The 8’ clearance is required to be maintained for a distance of 3’ from the edge of the roof. Show the mast height required to achieve the necessary clearance. 6. The conductors in a conduit in a wet location must comply with E3802.8 and be rated for use in a conduit in a wet location (i.e. THWN). 7. Show Arc-Fault Protection of all interior 15A & 20A circuits serving outlet locations (except exterior outlets) including receptacles, lights and smoke detectors with combination type arc-fault circuit interrupters, E3902.16. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 10/28/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |