Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-RES-1023-08923
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/18/2024 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | Permit Review TC-RES-1023-08923 • Other Inspection Reports Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC). 1. Welding special inspection notes welds at two locations that do not meet the detailed specifications. Note states this is approved by the SEOR. Provide a Sealed letter from the EOR, of the approved plans, acknowledging that the welds do not meet the design details and giving approval for the final state of the welds. 2. Please clarify the Design Strength of the “North Brick Wall for Garage”. 28 day sample shows an 87% Design Strength. Should the design strength for the CMU wall be 2000PSI and not 3000PSI? Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 07/18/2024 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | Permit Review TC-RES-1023-08923 • Other Inspection Reports Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC). 1. Welding special inspection notes welds at two locations that do not meet the detailed specifications. Note states this is approved by the SEOR. Provide a Sealed letter from the EOR, of the approved plans, acknowledging that the welds do not meet the design details and giving approval for the final state of the welds. 2. Please clarify the Design Strength of the “North Brick Wall for Garage”. 28 day sample shows an 87% Design Strength. Should the design strength for the CMU wall be 2000PSI and not 3000PSI? Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 07/12/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |