Permit Number: TC-RES-0926-05128
Parcel: 116214540

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.1

Permit Number - TC-RES-0926-05128
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2026 Residential Engineering APPROVED
09/29/2026 Residential Zoning APPROVED
09/29/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/21/2026 Residential Building REQUIRES RESUBMIT TC-RES-0926-05128
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review includes architectural, plumbing, mechanical, energy conservation and electrical compliance with the 2024 International Residential Code and 2024 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

GENERAL REQUIREMENTS:

The City of Tucson adopted the 2024 IRC with amendments and building ordinances for all dwellings.

Provide a separate response letter addressing each comment with location of change on the plans.

GENERAL COMMENTS:

1. Update the address (215 S SENTINEL PEAK) appearing at the top of sheet L3-CS and on the title block of each sheet.

PLANS:

1. Provide a minimum 6 mil polyethylene vapor retarder with joints lapped not less than 6 inches between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist, R506.3.3.

Please contact the plans reviewer if you have any questions:
Kenneth.VanKarsen@tucsonaz.gov
City of Tucson Residential Building Safety
09/18/2026 PDSD Application Completeness Express REVIEW COMPLETED