| 10/17/2024 | Site Zoning | APPROVED | |||
| 10/21/2024 | Site Engineering | NOT REQUIRED | |||
| 10/25/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/03/2024 | Residential Building | REQUIRES RESUBMIT | TC-RES-0924-05376 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2018 IRC with amendments and building ordinances for all dwellings. Update the 2021 code references on sheet A1, A2, D, E & P. Provide a response letter on separate file with submitting the updated construction plan set. GENERAL COMMENTS : 1. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. 2. All plans submitted for a newly constructed one- or two-family dwelling after March 1, 2009, require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation. 3. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Provide a future PV breaker space at the last panel space. 4. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one-story dwelling. Show a second clothes washer standpipe plumbed to an exterior wall above grade. Also provide gray drain-line discharge of all second story bathing fixtures through an exterior-wall drop for future gravity distribution. Include an aliened purple colored 2” or 3” vertical drop to a cleanout cap 2’ above grade. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations 5. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space. The 30 Amp receptacle at circuit #10/12 is undersized. SITE PLAN: 1. Note an electrical line as underground unless overhead is approved by TEP. https://www.tep.com/construction-applications/#apply 2. Show the square footage of living space, garage, and covered patios, R106.1.1. PLANS: 1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route. 2. Identify each wall line needed for enclosing a complete rectangle with sides no greater than 60’, Figure R602.10.1.1. Place these lines no further than 4’ from an actual parallel wall, so that corners are no further than 10’ from a “qualifying” braced wall panel. Show interior braced wall panels with foundation anchor bolt connection to bottom plates, R602.10.8.3 and R403.1.6, and roof connections, R602.10.8.2. 3. Show braced wall panel compliance for (narrow) framed walls with a garage door opening, Table R602.10.5. For prescriptive braced wall structures show a portal frame with hold-downs PFH method, Figure R602.10.6.2, or a portal frame at garage door PFG method, Figure R602.10.6.3, or a continuously sheathed portal frame CS-PF method, Figure R602.10.6.4. SECTIONS - DETAILS: 1. Show one-hour fire-resistive framed construction separating dwellings in compliance with IBC Table 721.1(2). 2. Provide a wall section detail with reinforced foundations for anchoring exterior framed walls with pressure treated sills including ½” anchor bolts with 7” embedment, R403.1.6. 3. Clarify the placement of ceiling/roof insulation for determining the need for attic ventilation, R806. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38 or R-30 when extended over the wall top plate for additions under 500 SF. Clarify the ceiling/roof insulation detail showing the air-impermeable rigid insulation material adhered to either side of the roof sheathing and the batt insulation in contact with the roof material. Also, show the batt insulation extended over the wall top plate. PLUMBING PLANS: 1. Tucson Water Department limits flow rates for each water meter size in compliance with P2903.7. Show the water meter size. ELECTRICAL PLANS: 1. Provide the Electric Vehicle Supply Equipment 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready” and locate the receptacle at a parking area, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2. 2. Interior 15A & 20A circuits serving outlet locations (except garage, kitchen, and bathrooms) including receptacles, lights, and smoke detectors require combination type arc-fault circuit interrupters, E3902.16. Provide notation. OUTDOOR LIGHTING CODE 1. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 401 or show full cutoff fixtures. Show lamps with a maximum of 3500K color temperature, OLC 402.1. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services |
||
| 10/25/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: SFR AND SLEEPING QUARTERS (CASITA) ACTIVITY NO: TC-RES-0924-05376 ADDRESS: 934 W MISSION LN ZONING: R-2 RESIDENCE ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Provide a NPPO Waiver form with your next submittal. This form requires photographs of the site where plants may be affected by construction. Either there are no protected native plants, or if there are, this exception proves that they won’t be disturbed by construction. It appears that there are existing plants near the grading limits for the new residence. If protected native plants are on site and will be disturbed, please provide an outline of how they will be protected in place or mitigated for. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
||
| 10/03/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 09/20/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |