Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-0923-08116
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/05/2023 | Site Zoning | APPROVED | |||
09/26/2023 | Site Engineering | NOT REQUIRED | |||
10/05/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/29/2023 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review TC-RES-0923-08116 (10100 E MILLMAR RD TUCSON, AZ 85730) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC). 1. Provide a special inspection certificate Sealed by the engineer of record. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf 2. Provide inspectors for the following Special Inspections: a. SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. b. SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. c. SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. d. SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. 3. On the construction documents, Sheet 2 of 9, sub-sheet S1.0. This sheet references details on a sheet S3.0. Provide this missing sheet Sealed by the EOR. 4. Provide manufacturer specification sheets for all collector panels, inverters, mounting hardware, Disconnect switch, combiner box, PV production meter box, etc. R324.3 Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
09/19/2023 | PDSD Application Completeness | REVIEW COMPLETED |