Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0923-07868
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/11/2023 | Site Engineering | NOT REQUIRED | |||
| 09/29/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/26/2023 | Residential Building | REQUIRES RESUBMIT | TC-RES-0923-07868 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: Each dwelling unit with kitchen requires a separate Pima County assigned street address after Zoning approval, R319. An impact fee payment is required for an ADU at the time of permit payment. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. SITE PLAN: 1. Show the location and size of buildings, utility meters and gas, water, electrical, and sewer including the HCS, R106.1.1. Each dwelling requires an independent electrical service and water supply shut off devices. Identify the utility lines requiring upgrade or replacement. 2. Show the square footage of the proposed carport and covered patio. PLANS: 1. Notate a cool (white) roof finish as required by the ADU provisions. 2. Provide manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona, or notate the requirement for deferred submittal, R106.1. SECTIONS - DETAILS: 1. Provide a complete wall section showing prescriptive 2018 IRC compliance. Include concrete foundations for anchoring exterior framed wall sills with ½” anchor bolts, 7” embedment, (R403.1.6) and with 6” minimum height above finished grade, R404.1.6 & (R317.1 item 5). 2. Show an unvented roof assembly with all insulation at the roof including an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing as part of the total insulation requirement, R806.5. PLUMBING PLANS: 1. Show an individual accessible water supply shut off and water heater for the proposed dwelling unit, P2903.9.1. MECHANICAL PLANS: 1. Show the HVAC system size, M1601.1. 2. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation with controlled exhaust, R303.4; N1103.6 & M1505.4. Show the airflow rate setting. A one bedroom dwelling under 1501 SF requires a 30 CFM continuous setting. 3. Show dryer vent size and location for venting to exterior, M1501. ELECTRICAL PLANS: 1. TEP may require the service panel for the property at the closest building to the service transformer. A service line change or a new meter location must be coordinated with TEP for approval. Show an underground feeder from a metered service panel to the more distant dwelling. 2. Update the Riser Diagram for the close dwelling and the feeder size to the detached dwelling panel per TEP coordination, NEC 225.30 and E3403. Installing a mast height providing 8’ overhead line clearance above the a roof may not be feasible, E3604.2.1. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. If you have any questions, please contact: PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
| 09/29/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Nathan Herrera Planner PROJECT: TC-RES-0923-07868 Address: 3173 E Terra Alta Bl. Tucson, AZ. 85716 Parcel: 125-14-0330 Zoning: R-2 Existing Use: Duplex Project Description: Accessory Dwelling Unit and Carport TRANSMITTAL DATE: 9/29/2023 This site is located in the R-2 zone (UDC 4.7.9). Multifamily Development is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10. 1. 2. COMMENT: Per UDC Section 11.3.7.A.3, multifamily development is defined as “Any residential development consisting of three or more dwelling units on an integrated site or single lot.” Per UDC Section 6.3.3.C, “multifamily development is considered a nonresidential use”. Nonresidential uses require the approval of a Development Package before building permits can be approved. Zoning cannot approve of this permit until a Development Package for the site is approved. 2. COMMENT: See below for additional information related to the Development Package submittal. 1. Development must comply with Administrative Manual Section 2-06.0.0: Development Package (Tentative Plats and Site Plans). Building permits may be applied for concurrently with the development package; however, the development package must be approved and issued prior to approval and issuance of the associated building permits. 2. An Accessory Dwelling Unit (ADU) is a permitted use in the R-2 zone, subject to use-specific standards 4.9.7.B.6, .9, and .10, and 6.6.3. 3. Three on-site motor vehicle parking spaces are required for the development. The required parking space for the ADU may be waived if the site is located within 1,320 feet of a transit stop or an enhanced bike route as listed in the Bike Boulevard Master Plan. 4. Ensure that the proposed ADU is developed with a high albedo level (>60 SRI) or other cool roof technology per the ICC Green Construction Code (UDC 6.6.3.B.3). 5. While the development shall adhere to UDC 7.4.6 Motor Vehicle Use Area Design Criteria, the surfacing requirements of UDC 7.4.6.I are exempt. A street or alley may be utilized for access and maneuvering (UDC 7.4.6.K.1.a). 6. Per UDC Table 6.3-2.A, when a nonresidential use is adjacent to a residential zone, the required interior perimeter yard setbacks are ten feet or ¾ the height of the proposed exterior building wall, whichever is greater, measured from the property line. A Design Development Option (DDO) in accordance with UDC 3.11.1 may allow setbacks to be reduced up to one foot from the property line. Contact me if you have questions about the DDO process. 7. Lot coverage shall not exceed 75% (UDC Table 6.3-2.A). 8. Two short-term and two long-term bicycle parking spaces are required for the development (UDC Table 7.4.8-1). Bicycle parking shall adhere to UDC 7.4.9. 9. Ensure that one of the required motor vehicle parking spaces is “EV Capable” (UDC Table 7.4.11-1). 10. Ensure compliance with Technical Standards Manual Section 7-01.4.3. All sidewalks must be a minimum of four feet wide and installed to avoid any obstruction which decreases the minimum width to less than four feet. 11. Ensure access standards found in Section 7.8 of the UDC and Sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. 12. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions about this transmittal, please contact Nathan Herrera at Nathan.Herrera@TucsonAZ.gov or at 520-837-4894. |
||
| 09/08/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |