Permit Number - TC-RES-0826-04863
Review Name: RESIDENTIAL SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/01/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/01/2026 | Light Residential Building Review (OIP) Express | REQUIRES RESUBMIT | If you have questions regarding this Review, please contact Juan Quintana at juan.quintana@tucsonaz.gov Please resubmit addressing the following comments: Electrical: 1) A Surge Protection Device (SPD) or SPD model number must be identified on the plans for all service panel replacements supplying 100% of the dwelling. This requirement can be satisfied by providing the manufacturer’s specifications or model number for the SPD to verify UL listing and code compliance with the E606.5 & NEC 230.67 2) Refer to TEP's Electrical Service Requirements for burial depth and service connection requirements, See TEP Construction Services at https://www.tep.com/construction-applications/ Fuel Gas: 1) Please clarify work being done to gas line and include new lengths from the existing meter and interconnection point. Modification to fuel gas lines require a completes gas pipeline template (or equivalent) be submitted, this includes showing the connection from the meter to each gas branch and appliances (Include all lengths, pipe material, changes in pipe material, and pipe size). G2412.3, G2413.2, G2413.4, 2) Fuel Gas line shall be installed at a minimum depth of 12" below grade G2415.12 Please indicate depth on plans. 3) If applicable, an 18 AWG yellow insulated copper tracer wire or equivalent, must be installed adjacent to nonmetallic piping. Access to the tracer will terminate 12 inches above ground and be suitable for direct burial G2415.17.3 Main Water Line: 1) Verify burial depth, bedding, sleeving, and protection for underground piping portions. 18" under grade 2) Provide Water service pipe material adhering to P2906.4; Please note, Joints between different materials must adhere to P2906.18 Building Drain/Sewer Line: 1) Show cleanouts according to 3005.2, indicate where the sewer line replacement will occur in relation to Building Drain/Sewer Junction. 2) Drain sizing for future fixtures must adhere to P3005.1.5 as it contributes to Drain/Building Sewer load P3005.4.2 3) Slope must meet 3005.4.2 requirements at time of installation |
||
| 08/31/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |