Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SIMPLE REVIEW v.1
Permit Number - TC-RES-0826-04520
Review Name: RESIDENTIAL SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/14/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/14/2026 | Light Residential Building Review (OIP) Express | REQUIRES RESUBMIT | If you have questions regarding this Review, please contact Juan Quintana at juan.quintana@tucsonaz.gov Please resubmit addressing the following comments: 1) Provide HVAC equipment model numbers, capacities, and efficiency ratings for compliance verification 2024 IECC R403.7 2) Show adherence to Programmable Thermostat requirement for HVAC Installation controls based on 2024 IECC 403.1.2 3) If the HVAC capacity will change from existing, provide a Manual J calculation showing the sizing of the unit to be installed is adequate for the designated area. 4) Provide fuel type and fuel demand, based on fuel type the following may be required: Fuel Gas: 1) Include pipe size, type (Black Iron, Poly) and length. Show connections for gas meter to all gas appliances. Modifications to the gas system requires the submission of a gas pipeline template (or equivalent), G2401.1, G2413.1, R301.1 2) Size the pipe based on the length from the meter to the farthest attached appliance and max total demand of all attached appliances using Table G2413.4(1) (Metallic Pipe), Table G2413.4(7) Polyethylene Plastic Pipe. Note: The length is measured from the meter to the furthest attached appliance for all sizing, G2413.4.1. See: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/gas_handout_2018_irc_2019.2.4.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/gas_piping_template_060324.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/gas_piping_sample_060324.pdf Electric: 1) Provide a Load Calc. for the electrical including additional load from the new unit. NEC 220 Part III. Include conductors and all supplemental equipment used to supply the new central unit. 2) Outdoor receptacles supplied by a single-phase branch circuit must have GFCI protection for personnel E3902.3, 210.8(A)(3) 3) GFCI Service receptacle must be provided within 25 ft of the HVAC system 210.63 |
||
| 08/13/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |