Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL ADD/ALT v.1
Permit Number - TC-RES-0725-03543
Review Name: RESIDENTIAL ADD/ALT v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/13/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/16/2025 | Addressing Validation | REQUIRES RESUBMIT | The site plan address does not match the permit address. Please fix the site plan or submit a change of address request through subrecords. | ||
| 08/13/2025 | Residential Building - Standard | REQUIRES RESUBMIT | Can not approve until address validation issues are resolved. | ||
| 08/12/2025 | Site Zoning - Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-RES-0725-03543 4512 E MONTECITO ST. – R-1 Fire Damage Repair and Electrical Reconnect (1st Review) TRANSMITTAL DATE: August 12, 2025 COMMENTS: Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments. This site is located in the R-1 zone (UDC 4.7.8). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9. 1. Clarify what this permit is for. The description states “Fire Damage Repair and Electrical Reconnect” and the scope of work on the plan states “REBUIDLING AN EXISTING CARPORT, LIKE FOR LIKE” and there is already a permit, TC-RES-0525-02482 for Repair Fire Damaged to a carport and storage area. Also, the comprehensive site plan on sheet 1 shows the area of work as the carport only. The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 07/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |