Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.2
Permit Number - TC-RES-0723-06522
Review Name: RESIDENTIAL NEW DWELLING v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/26/2023 | Site Zoning | APPROVED | |||
| 08/08/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/08/2023 | Residential Building | REQUIRES RESUBMIT | TC-RES-0723-06522 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. PROVIDE A COMPLETE PLAN SET showing all proposed alterations to the building with 2018 IRC code compliance with component sizes. The plans require sufficient detail for demonstrating an awareness of minimum building code compliance for passing all progress inspections. Consider using a design professional if unfamiliar with construction documentation. SITE PLAN: Provide a site plan showing dimensions of all buildings requiring a permit, R106.1.1. Show the location of all utility lines from property line to building(s) along with required alterations. FLOOR PLAN: Provide a floor plan showing each proposed room with labeled function and dimensions. Show door locations and window sizes with type identified as XO or SH. Include the identification of adjacent rooms with door or window openings in the proposed space. Bedroom windows must show code compliance for egress, R310. STRUCTURAL PLANS: 1. Provide a appropriately sized beam at the removed load bearing wall showing compliance with the 2018 IRC or provide an Arizona structural engineer plan set showing performance compliance, R301.1. SECTIONS - DETAILS: 1. Provide a proposed section showing compliant features including a foundation, treated sills, anchoring, framing, sheathing and insulation, R106.1. 2. Show a complete cross-section detail of the new exterior wall, R106.1.1. Show the minimum 12” x 12” continuous #4 rebar reinforced footing, R403.1. Show with dimensions the exterior wood siding, insulation, interior sheathing, and pressure treated sill anchored with ½” x 10” bolts. Show the wall assembly with a 6” clearance above the ground or 2” clearance above an exterior concrete surface, R317.1 item 5. 3. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38 or R-30 when extended over the wall top plate for additions under 500 SF. ELECTRICAL PLANS: 1. Show receptacle outlets at wall spaces 2’ or more with no wall point (exclude door openings) more than 6’ from a receptacle outlet, E3901.2. 2. Show at least one wall-switch-controlled lighting outlet providing illumination on the exterior side of each egress door having grade level access R3903.3. 3. Notate interior 15A & 20A circuits serving outlet locations (except garage, kitchen, and bathrooms) including receptacles, lights and smoke detectors with combination type arc-fault circuit interrupters, E3902.16. INTERNATIONAL ENERGY CONSERVATION CODE: Provide insulation details minimum (R-13 walls and R-30 small additions or otherwise R-38 ceiling) showing code compliant placement of materials and ratings, N1101. Windows require a solar heat gain of 0.25 or better. OUTDOOR LIGHTING CODE Provide any alterations with details showing compliant fixtures. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 3.1.2. Include all exterior fixtures on the property in the calculations or show proposed fixtures as Full Cut Off (night sky friendly). If you have any questions, please contact: Ken Van Karsen PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services |
||
| 07/27/2023 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TI’s and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Lianne Evans at lianne.evans@tucsonaz.gov or Stephen Blood at Stephen.Blood@tucsonaz.gov if you have any questions about the FUP. |
||
| 07/26/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |