Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL FENCE/WALL v.1
Permit Number - TC-RES-0626-03175
Review Name: RESIDENTIAL FENCE/WALL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/17/2026 | Light Residential Building Review (OIP) | NOT REQUIRED | |||
| 06/17/2026 | Residential Zoning | NOT REQUIRED | |||
| 06/18/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/18/2026 | Residential Engineering | REQUIRES RESUBMIT | Permit Activity Number: TC-RES-0626-03175 (1st Review) Project: Installation of 109LFT of vinyl fence, Finish Height of 4'; White Open Picket Vinyl Fence, Dog Ear Cap with 3in Width Pickets, with Standard 2"x6" Rails, 1 Metal Bottom Rail Stiffener, and Pyramid Post Cap, including one Vinyl Single Gate; 5’ Wide, and one Vinyl Single Gate; 4’ Wide. Location: 1341 S EDLIN AV Review Date: 6/18/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Reviewer Contact: Marco.contreras@tucsonaz.gov Related cases: Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering. To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files. Site Engineering Review Comments: 1. Provide a fully dimensioned site plan so that proper review can be conducted. Ensure that the site plan is dimensioned with proper property boundaries, applicable setbacks of structures and all existing items that exist on the property, and ensure to demonstrate where the wall/fence is being proposed/built. 2. Ensure to denote on the submitted site plan, the total linear footage of the new proposed fence. |
||
| 06/15/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |