Permit Number: TC-RES-0626-03027
Parcel: 135042520

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SIMPLE REVIEW v.1

Permit Number - TC-RES-0626-03027
Review Name: RESIDENTIAL SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/08/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/08/2026 Addressing Validation REQUIRES RESUBMIT If you have questions, please contact PDSD-Permits@tucsonaz.gov.

Please include full property address on site plan and resubmit after other reviews are complete.

Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-re…
06/08/2026 Light Residential Building Review (OIP) Express REQUIRES RESUBMIT If you have questions regarding this Review, please contact Juan Quintana at juan.quintana@tucsonaz.gov

Please resubmit addressing the following comments:

1) Provide load calculations including the EV charger and new loads (Optional method). As of Jan. 1, the City of Tucson has adopted the 2024 I-codes and 2023 NEC. Verify that all calculations adhere to the variables present in the new code. Include the appliances or expected demand to determine conductor sizing, see comments below.

2) Provide a one-line diagram with all equipment to be installed (including CTs or electrical monitoring equipment) as a part of the EV charging system and the added loads. Show the number of conductors required for this installation and the conduit size to determine conduit fill does not exceed 40%. Include EGC and grounded conductors.

3) Provide Manufacturer Specifications of the EV charger to be used. Include any certifications to ensure that the EVSE is UL listed E404.14.1

4) Site plan does not show location of installation will be protected from impact. Show the location of the EV charger is protected from vehicular impact. E3404.10, 110.27(B)

5) EV charger must be GFCI-capable, alternatively provide a means of GFCI protection (including GFCI Overcurrent Protection Devices (OCPD)) 625.54

6) Provide manufacturer specifications and wiring diagram for the proposed EVSE to verify whether a grounded conductor (neutral) is required for the installation. Installation shall comply with NEC 110.3(B), 220.61, and 625.42.

7) Indicate the rating of the overcurrent protective device (OCPD) to be installed and include the equipment grounding conductor (EGC) size on the plans. Provide conductor sizing and overcurrent protection details sufficient to verify compliance with NEC 210.19, 240.4, and 250.122.
06/08/2026 PDSD Application Completeness Express REVIEW COMPLETED