Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.3
Permit Number - TC-RES-0623-05620
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/12/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/12/2023 | Commercial Mechanical | REQUIRES RESUBMIT | Beginning on January 1, 2023, the Department of Energy minimum efficiency standard for central air conditioning systems was increased from 14.0 to 15.0 SEER using DOE’s pre-2023 appendix M test procedure. Also, based on the DOE definition of the installation of a central air conditioner, all equipment not operational on January 1, 2023, in the Southwest region, must have an EnergyGuide label identifying a SEER2 or SEER2/EER2 rating. The submitted AHRI Certificate of Product Ratings does not show that the proposed split system meets the current efficiency requirements. [Initial comment: Provide a split system that is compliant with the 2023 DOE efficiency requirements for air conditioning systems for this locale.] | ||
| 12/11/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |