Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL POOL REVISION v.2
Permit Number - TC-RES-0525-02397
Review Name: RESIDENTIAL POOL REVISION v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/08/2025 | Site Zoning | APPROVED | |||
| 08/26/2025 | Site Engineering | NOT REQUIRED | |||
| 09/08/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/29/2025 | Residential Building | REQUIRES RESUBMIT | ACTIVITY NO. TC-RES-0525-02397 PROJECT: RESIDENTIAL POOL ADDRESS/PARCEL: 2311 E POTTER PARK CT Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Swimming Pool and Spa Code, 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. COMMENTS: 1. Please clean this submittal up. This layout plan references an outdoor kitchen (see call out #10 – and clearly references electrical work that needs a contractor, will need inclusion on this permit or a separate one), landscape (COT PDSD has no need to know where the existing trees are on this site), outdoor , opening an existing interior fireplace (will need a Residential Addition/Alteration permit), etc. 2. Show the existing pool to be demo’d on a separate demolition plan. 3. Show the dimensions between the pool & spa to all structures on site, i.e. walls, and residence if that is being considered part of the structure. 4. Show access arrow. 5. Barrier code information is missing from plan set. 6. Gates must swing away from the pool. 7. Show the gas line and call out the length, size and type along with the BTU’s required to run the heater. 8. Show the electrical run from the main panel to the equipment. 9. Show the equipment on the plan document. 10. Clearly show the property line and all dimensions associated with it. Please upload your revised plans to TDC-Online with a revision letter outlining what has been revised on the doc set. Resubmittals will not be accepted without the revision letter that answers all of the above comments. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov |
||
| 08/25/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |