Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-0524-03294
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/28/2024 | Site Engineering | NOT REQUIRED | |||
| 06/28/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/20/2024 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review TC-RES-0524-03294 (2568 W CALLE PUEBLA TUCSON, AZ 85745) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC). Provide a complete plans set showing compliance with all applicable code sections in the IRC and NEC. 1. Provide a system layout plan showing the location of system components in relation to structures and utilities, R106.1. Include all components, including junction boxes, combiner panels, inverters, DG disconnects, main service entrance. 2. Provide a 1-line diagram identifying each relevant component and circuit notating sizes and installation details. Show the solar interconnection is compliant with NEC 690 and NEC 705.12. Include conductor and conduit sizes and types. 3. Provide a 3-line diagram identifying each component and circuit notating sizes and installation details. (Wire size and type, OCPD, MSP bus rating, MSB, PV backfeed OCPD). 4. Show the equipment grounding conductor size as required by NEC Table 250.122 (#14 for 15A, #12 for 20A & #10 for 30 – 60 A). 5. Specify and show a continuous Grounding Electrode Conductor ( NEC 250.64(C ), 250.160). 6. Provide Main Service Panel (MSP) and Sub panel taps in compliance with NEC 705.12*; Method of connection to service: back-fed breaker, or line side tap. Provide back-fed breaker size and calculations. 705.12(B)(2)(3) b Busbars.) 120% bus bar rule. 7. Provide the exact wording and location for the Photovoltaic system Warning signs and labels as required in NEC 690 and 705.12(B)(2)(3) b-c. Or note that the existing waning signs and labels at the existing Main Service Panel will be maintained on the new panel. a. “Photovoltaic System Disconnect” NEC 690.13(B) b. NEC 690 Part VI Markings – NEC 690.51-58 c. NEC 690.33(E). 8. Conductor size and over-current protection calculations. 9. Roof conductor calculations are to be based on an ambient temperature of 71°- 80° C (159°- 176° F) using the adjustment factor.58. 10. Non-roof conductor calculations are to be based on 41°- 45° C (105°- 113° F) using the adjustment factor of.87 (Per NEC 310.15 (B) (2) (c)) 11. AC Overcurrent Protective Device and Conductor Sizing for PV source Circuits and Module Interconnection Conductors (Imax x 1.25) Reference NEC 690.8(A)(3) and (B)(1). Show a complete calculation for determining OCPD and conductor requirements. 12. Show compliance with 2017 NEC 690.12 Rapid Shutdown of PV Systems on Buildings. PV system circuits installed on or in buildings shall include a rapid shutdown function to reduce shock hazard for emergency responders in accordance with 690.12(A) through (D). 13. Provide manufacturer specification sheets for all collector panels, inverters, mounting hardware, power optimizers, batteries etc. R324.3 14. Provide Solar module roof loading data and mounting system with fastener sizes and calculations for dead load and wind uplift. Show required PV module railing, mounting system and attachment methods. 15. Show the solar racking and mounting points on the roof diagram. Additional comments may be forthcoming given a complete plan set. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 05/31/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |