Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0524-03184
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/13/2024 | Residential Building | APPROVED | |||
| 06/26/2024 | Site Engineering | NOT REQUIRED | |||
| 06/26/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/18/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: Wyatt Berger Lead Planner PROJECT: TC-RES-0524-03184 8811 East Baker Street – R-1 New carport and walkway (1st Review) TRANSMITTAL DATE: June 18, 2024 The following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). 1. Based on lot dimensions of 82’ x 100’, the lot size provided on the site plan shall be corrected to 8,200 square feet. Ensure the lot coverage calculation is updated to reflect the correct lot size. 2. Remove the existing porch and proposed walkway from the lot coverage calculation. Per UDC 6.4.3.C.1.a, roofed areas, open on at least one side, which provide shelter to exterior areas, provided they are not used for utilities, maintenance, laundry, storage, or motor vehicle parking, are not included in the lot coverage calculation. 3. Provide a dimension from the centerline of Baker Street to the face of curb, as well as a dimension from the face of curb to the street property line. Per page seven of paving plan I-62-027, the distance from the centerline of Baker Street to the face of curb is sixteen feet, with a half right-of-way width of 25 feet. The street property line is also located one foot behind the existing sidewalk. See pages two and seven of the paving plan for specifics: https://maps-and-records.tucsonaz.gov/construction-plans/details/I-62-027. 4. Per UDC 6.4.5.C.1.a, for single-family development, the minimum required front street perimeter yard is twenty feet as measured from the street property line. The proposal does not meet this requirement. As such, Design Development Option (DDO) approval is required to reduce the front street perimeter yard. Ensure all paving dimensions are shown on the site plan to verify the proposed perimeter yard. The DDO application and requirements can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/planning-amp-zoning/ddo_for_setback_and_height_udc.pdf. Contact Georgia.Pennington@tucsonaz.gov or Mark.Castro@tucsonaz.gov if you have questions about the DDO process. If you have any questions about this transmittal, contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised plan set as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 05/28/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |