Permit Number: TC-RES-0524-02777
Parcel: 112041340

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.2

Permit Number - TC-RES-0524-02777
Review Name: RESIDENTIAL NEW DWELLING v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/27/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/13/2024 Residential Building REQUIRES RESUBMIT TC-RES-0524-02777
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

GENERAL REQUIREMENTS:

Provide a response letter on separate file with submitting the updated construction plan set.

GENERAL COMMENTS :

1. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc.
2. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 .
a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces.
b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker space to the last panel space. Relocate the label circuit #40/42 and remove the breaker and wire size.
3. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one-story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations
4. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space.

PLANS:

1. Notate a cool (white) roof finish (greater than 60 SRI) as required by the ADU provisions.
2. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include all threshold conditions for a route from the exterior into the living space.

SECTIONS - DETAILS:

1. Show exterior wood siding, sheathing and wall framing with a 6” clearance above the ground (R317.1 item 5). The weep screed may extend with a minimum clearance 4” above grade or 2” above paved areas, R703.7.2.1. Update detail EF on sheet 2.
2. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38 or R-30 when extended over the wall top plate for additions under 500 SF. Clarify the ceiling/roof insulation detail showing the air-impermeable rigid insulation material adhered to either side of the roof sheathing and the batt insulation in contact with the roof material. Update detail EFL & EFH on sheet 6.

MECHANICAL PLANS:

1. Show a dryer vent size and location for venting to exterior, M1501.
2. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation with controlled exhaust, R303.4; N1103.6 & M1505.4. Show the minimum airflow rate setting and location of the device requiring this adjustable setting. A one-room dwelling under 1501 SF requires a 30 CFM continuous setting.

OUTDOOR LIGHTING CODE

1. Show full cutoff fixtures were located within 25 feet from the property line OLC 401.3.3.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans.

If you have any questions, please contact:
PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review

Submit a corrected plan set at https://www.tucsonaz.gov/pdsd
06/27/2024 Site Engineering REQUIRES RESUBMIT This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page:
https://tdc-online.tucsonaz.gov/#/home
NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed.
Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”
Contact Lianne Evans at lianne.evans@tucsonaz.gov if you have any questions about the FUP.
06/20/2024 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-RES-0524-02777
2549 E BLACKLIDGE DR Unit: 2 – R-1
New ADU (1st Review)

TRANSMITTAL DATE: June 20, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the R-1 zone (UDC 4.7.7). A single family residence with an accessory dwelling unit (ADU) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6, 8, & 9 and 6.6.3.

1. The green shown on the plans is difficult to read. Please submit black and white plans.

2. Provide dimensions from design grade to where the wall meets the eave of the roof for all exterior walls on the elevations so that required perimeter yard setbacks can be verified.

3. Clearly demonstrate that the requirements of 6.6.3.B.3 are met.

COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1).

Perimeter yard setbacks are based on a wall height measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. Where the wall meets the eave of the roof. As wall height were not provided from design grade to where the wall meets the eave of the roof Zoning has used a measurement feature in our review software, Bluebeam. These measurements are not totally accurate and changes to comments may be required once the required measurements from design grade to were the wall meets the eave have been provided.

The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A).

4. Based on an assumed wall height of 9’-11” the required perimeter yard setback from the proposed ADU to the north property line is 6’-8”, proposed setback is 4’-0”.

5. Based on an assumed wall height of 8’-9” the required perimeter yard setback from the proposed ADU to the west property line is 6’-0”, proposed setback is 3’-0”.

DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. If you have questions about the DDO application or process please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
05/29/2024 PDSD Application Completeness Express REVIEW COMPLETED