Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0524-02709
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/11/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/23/2024 | Residential Building | REQUIRES RESUBMIT | TC-RES-0524-02709 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: Provide a response letter on separate file with submitting the updated construction plan set. A special inspection request is required with the updated plans for the post-tensioned slab, R109.2. GENERAL COMMENTS : 1. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one-story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations 2. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space. Upgrade circuit #A5/7. PLANS: 1. Provide the engineered design for a post tension slab or remove the option note from sheet S1.1, R301.1. 2. Provide a complete roof framing plan for the hip roof design or provide a manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona, or notate the requirement for deferred submittal, R106.1. 3. Provide a header schedule or identify compliant header sizes supporting the roof consistent with Table 502.5(1) & R602.7(1). 4. Identify each wall line needed for enclosing a complete rectangle with sides no greater than 60’, Figure R602.10.1.1. Place these lines no further than 4’ from an actual parallel wall, so that corners are no further than 10’ from a “qualifying” braced wall panel. Show interior braced wall panels with foundation anchor bolt connection to bottom plates, R602.10.8.3 and R403.1.6, and roof connections, R602.10.8.2. A sheer wall design requires a calculation report with professional seal. 5. Show braced wall panel compliance for (narrow) framed walls with a garage door opening, Table R602.10.5. For prescriptive braced wall structures show a portal frame with hold-downs PFH method, Figure R602.10.6.2, or a portal frame at garage door PFG method, Figure R602.10.6.3, or a continuously sheathed portal frame CS-PF method, Figure R602.10.6.4. PLUMBING PLANS: 1. Tucson Water Department limits flow rates for each water meter size in compliance with P2903.7. Show an appropriate water meter size. 2. Show gas pipe sizes in compliance with connected demand, G2413.3 & Table G2413.4(1). The 1-1/4” gas pipe is undersized for delivering 325,000 BTUh with a developed length greater than 125 feet. MECHANICAL PLANS: 1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation with controlled exhaust, R303.4; N1103.6 & M1505.4. Show the minimum airflow rate setting and location of the device requiring this adjustable setting. A four-bedroom dwelling greater than 1500 SF requires a 75 CFM continuous setting. ELECTRICAL PLANS: 1. Provide a circuit breaker on Panel A for the protecting the Panel B feeder, E3702.2. 2. Include the Electric Vehicle load entry (typically 7680 watts or 32 AMPS) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2. The 16 AMP Future PV entry may be removed per Appendix T. 3. Interior 15A & 20A circuits serving outlet locations (except garage, kitchen, and bathrooms) including receptacles, lights, and smoke detectors require combination type arc-fault circuit interrupters, E3902.16. Provide notation. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services |
||
06/10/2024 | Site Engineering | REQUIRES RESUBMIT | 1. The limits of grading on the plans provided with this submittal does not match the limits of grading on the approved development package TD-DEV-0324-00100. The grading plans must match. Please revise the plans to match the approved development package or revise the development package to reflect the changes in the grading plans. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
06/11/2024 | Site Zoning | REQUIRES RESUBMIT | See Engineering comments. | ||
05/23/2024 | Fire New Construction | REVIEW COMPLETED | |||
05/13/2024 | PDSD Application Completeness | REVIEW COMPLETED |