Permit Number: TC-RES-0523-05575
Parcel: 11904045A

Address:
3652 S 8TH AV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.1

Permit Number - TC-RES-0523-05575
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/08/2023 Site Engineering NOT REQUIRED
06/08/2023 Site Zoning NOT REQUIRED Roof repair and replace
06/26/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/26/2023 Residential Building REQUIRES RESUBMIT Permit Review TC-RES-0523-05575 (3652 S 8TH AV TUCSON, AZ 85713)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Residential Code (IRC).

1. Replacing the roof sheathing requires a roof framing plan showing compliance with structural and insulation requirements. Provide a roof framing plan showing extent of roof sheathing replacement.
2. Provide a complete roof framing plan with truss, beams and rafters sized with appropriate prescriptive load carrying capacity, R301.1. Notate and specify a complete roofing system: Roof sheathing, size (1/2” OSB) and method of installation (moisture barrier, flashing, etc.), R803.2, R905.
3. Show or notate required nailing per R803.2.3.
4. Show a roof ventilation plan with a minimum of 1” air space between the insulation and roof sheathing, R806. And show attic vent openings effectively sized for the attic area per R806.2. Or in the case of a non-vented roof assembly, provide condensation control with an air-impermeable rigid insulation material tight to the roof sheathing with a minimum R-5 value, R806.5. The total R-38 insulation value may be achieved with foam (spray/board) and batt layers.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
06/02/2023 PDSD Application Completeness Express REVIEW COMPLETED