Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-RES-0523-04862
Parcel: 123051740

Address:
1825 N NORTON AV

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.1

Permit Number - TC-RES-0523-04862
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/12/2023 Site Engineering NOT REQUIRED Out of floodplain delineation
05/25/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
05/25/2023 Residential Building REQUIRES RESUBMIT Permit Review TC-RES-0523-04862 (1825 N NORTON AV TUCSON, AZ 85719)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken.
Code reference, 2018 International Residential Code (IRC).

General Note:
1. Additional comments may be forthcoming based on updated plans.

SITE PLAN:
1. Show the location and size of buildings, utility meters and gas, water, electric and sewer or septic lines from property line to building, R106.1.1. Identify the utility lines requiring upgrade or replacement.
2. Roof projections extending into the 3-foot fire separation distance to the neighboring property line require not less than one-hour fire-resistive construction on the underside, R302.1 (City of Tucson Amended). The fire protected overhang may not extend closer than 24” from the property line.

FOUNDATION PLANS:
1. Locate and size reinforced footings for supporting live and dead structural loads, R401.2 or provide an engineer’s calculation, design and seal for a performance design when minimum sizes are not code compliant with the IRC, R301.1.
2. Show exterior footings at least 12” below the undisturbed ground surface, R403.1.4.
3. Show or notate a 6” minimum separation of untreated exterior posts above finished grade or metal post base with 1” space above concrete, R317.1.4 exception

STRUCTURAL PLANS:
1. Specify design criteria on plans. Provide values for roof dead load and live load, R301.3. (City of Tucson Amended).
2. Provide an engineer’s calculation, design and seal for a performance design when minimum sizes are not code compliant with the IRC, R301.1.
3. Locate and size beams, joist, and fasteners for supporting live and dead structural loads, R804 or provide an engineer’s calculation, design and seal for a performance design when minimum sizes are not code compliant with the IRC, R301.1.
4. Provide complete roof framing plans. Show size, spacing and span of all framing members, trusses, joists, rafters, beams, glue-lams, lintels, headers, ledgers and blocking, R301.1.
5. Provide diagonal bracing or an engineered lateral analysis for a structure without braced wall support, R301.1.
6. Completely detail all post connections from post base to the foundation and beam connections to the post, R301.1.
7. Show a beam size with appropriate load carrying capacity, R301.1, 4x10 beam is undersized and requires a larger size or provide an engineer’s calculation, design and seal for a performance design when minimum sizes are not code compliant with the IRC, R301.1.
8. Show rafter beam connection using (H2.5) ties having a resistance to uplift of not less than 365 pounds, R802.11.1. (City of Tucson Amended).
9. Maximum cantilever of a roof structure is 24”, 802.7.1.1, Remove excess cantilever or provide an engineer’s calculation, design and seal for a performance design when sizes are not code compliant with the IRC, R301.1.

ELEVATIONS:
1. Provide complete drawings of all elevations, R301.1.
2. Indicate all materials used; stucco, concrete block, glass block, roofing system, siding, veneer, etc., R301.1.

SECTIONS - DETAILS:
1. Provide a complete cross-section detail from foundation to roof assembly, R106.1.1.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
05/16/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review

PROJECT: TC-RES-0423-04862
1825 N. Norton Av. – R-1
Covered Deck (1st Review)

TRANSMITTAL DATE: May 16, 2023

Provided a detail comment response letter with your submittal that clearly shows how you have addressed all comments with your next submittal.

This site is located in the R-1 zone (UDC 4.7.8). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5

1. Provide a residential plot plan that meets the requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf. Once the required plot pl

Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A.

The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A).
2. As no plot plan showing perimeter yard setbacks to the property lines Zoning is providing the following requirements. Based on a height of 10’-1” the required perimeter yard setback would be 6’-9”. For the proposed type structures this setback distance is measured form the post supporting the roof structure. If the proposed structure does not meet perimeter yard setback requirements at a minimum a neighbor’s setback waiver (UDC6.6.2.D) will be needed. To secure this neighbor setback waiver the following statement must be provided on the plot plan and be signed and dated by the adjacent property owner(s):
My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan.

Signature: _____________________________

Date: _________________________________

If setback requirements are not met and you cannot secure the waiver a Design Development Option (DDO) must be submitted and approved to reduce the required setback, DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. If you have questions about the DDO application or process please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov.

3. Once the required plot plan is provided additional comments maybe forth coming.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov
05/05/2023 Fire New Construction REVIEW COMPLETED
05/03/2023 PDSD Application Completeness REVIEW COMPLETED
05/09/2023 Site Landscape REVIEW COMPLETED