Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL ADU v.1
Permit Number - TC-RES-0426-01733
Review Name: RESIDENTIAL ADU v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2026 | Landfill Standard | APPROVED | Signed Form provided through email and uploaded. https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-22345 The Landfill Ordinance Self-Certification Statement Form must be completed and submitted for approval. |
||
| 05/12/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/15/2026 | Addressing Validation | REQUIRES RESUBMIT | For questions: PDSD-Permits@tucsonaz.gov The permit and plan show to be for an Accessory Dwelling Unit (ADU) and requires to be separately addressed. Please contact Pima County Addressing at addressing@pima.gov or 520-724-9512 to assign/add the units or a new address for this ADU. Please resubmit your plans and all supporting permit documents to reflect the updated address, in addition, a change of address request will need to be submitted in order to properly update the location of this permit. Instructions can be found here to request change of address: https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf |
||
| 04/15/2026 | Residential Building | REQUIRES RESUBMIT | TC-RES-0426-01733 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2024 International Residential Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2024 IRC with amendments and building ordinances for all dwellings. Provide a separate response letter addressing each comment with location of change on the plans. PLANS: 1. Each dwelling requires a clear 3-foot fire separation distance, or one unit requires a 1-hour fire-resistance rated assembly without openings, R302.3. It appears that both the existing SFR and the proposed ADU have openings in the adjacent facing walls. The ADU may be placed at the proposed location if the imaginary fire line is placed along the SFR east wall. The enclosure of the openings at this wall line of the SFR will require a separate permit for showing the alteration. Construction for each dwelling requires a separate permit. The ADU is a new dwelling permit and the construction for fire rating of the openings on the SFR should be an Addition/Alteration permit. 2. Provide a minimum 6 mil polyethylene vapor retarder with joints lapped not less than 6 inches between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist, R506.3.3. MECHANICAL PLANS: 1. Show the (dryer) exhaust opening not less than 3 feet from the property line, M1504.3. ELECTRICAL PLANS: 1. Show a smoke alarm in each bedroom and outside the doorway in the immediate vicinity, R310.3.2. If you have any questions, please contact: Kenneth.VanKarsen@tucsonaz.gov City of Tucson Residential Building Safety |
||
| 04/28/2026 | Residential Engineering | REQUIRES RESUBMIT | Permit Activity Number: TC-RES-0426-01733 (1st Review) Project: ADU Location: 901 S VERDUGO AV Review Date: 4/28/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter review time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. Provide a response letter addressing each comment with location of change on the plans. Submit the separate response letter and plan set files. Site Engineering Review Comments: 1. As the proposed development is a new dwelling (ADU, SFR, Duplex, Etc), Per the City of Tucson Inclusive Home Design Ordinance: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/inclusivehomedesignordinance.pdf, all new dwellings and units have a requirement to provide an “accessible route from public and common areas, including, but not limited to, a driveway or public street or sidewalk”. Draw, dimension, and label an accessible route from the driveway, sidewalk, or street to an accessible entrance. a. Refer to Technical Standards Manual Section 7-01.4.3 for sidewalk/pathway specifications including the minimum 4ft-width and composition minimums. b. Action Items: Provide a width call-out, proposed slope, and label the walkway as the “Accessible Route” leading to the new home entrance c. The current plans simply delineate a “Route” and will require further detail & information as requested. If you have any questions or concerns |
||
| 04/23/2026 | Residential Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Jeffrey W. Cassidy, Planner Planning & Development Services Department – Current Zoning Review Section PROJECT: TC-RES-0426-01733 – Residential Building – ADU 901 S VERDUGO AV TUCSON, AZ 85745 (R-1 Zoning) Site Plan Review – 1st Review TRANSMITTAL DATE: April 23, 2026 This site is in the R-1 Residence Zone (UDC 4.7.8). An accessory dwelling unit (ADU) is permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, 8, & 9 and 6.6.3. Plan review for the above referenced ADU has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. 1. COMMENT: A. As part of the passing of Ordinance 12219 this past December of 2025, the following landscaping is required for all new single family residential, middle housing development, and accessory dwelling units, as of January 01, 2026, per UDC 7.6.10. https://middle-housing-cotgis.hub.arcgis.com/pages/Residential-Landscaping-Code 1. One tree / 1,000 floor area. 2. A 5’-0” wide strip of vegetative groundcover is required within the front yard setback per the calculation below (minus the sections that have a driveway and/or pedestrian sidewalk (from the street sidewalk to the units’ front entrance). Parcels with less than 30 lineal feet of street frontage may place the required ground cover in alternate locations indicated on the site plan. (X Linear feet of Street Frontage) – (Y curb cut width) x (5 Foot Depth) = Z Square Feet of required vegetative groundcover. 3. Plants must be low to very low water use with a hardiness rating of 15 degrees Fahrenheit or lower and non-invasive. Options are listed in Section 5-02.5.0 of the Technical Standards Manual. Exceptions to these criteria or plants that are not listed in Section 5-02.5.0 of the Technical Standards Manual, may be approved by the PDSD Landscape Architect. B. Required landscaping must be located as follows: 1. A minimum of fifty percent of the required canopy trees must be located within the front yard setback area. i. Exception: If site constraints prevent new tree placement in a front yard, five shrubs may be substituted per required tree. Required trees must still be placed elsewhere on the site. Shrubs used as a substitute plant material for the required tree shall range from three feet in height by three feet in width, or larger. Shrubs must follow the relevant spacings from utility lines in section 5 01.5.11of the Technical Standards Manual but can be planted one radius of their mature width from foundations, enclosed sidewalks, sidewalks, and curbs. ii. Exception: The tree required for an accessory dwelling unit may be placed anywhere on site. 2. Trees may be planted at varying distances apart. 3. Required landscaping is not restricted to the first 10 feet onto the property from the existing or future right-of-way line. 4. Newly planted trees must be placed at a minimum distance from existing or proposed City of Tucson-owned or private utility-owned lines, as found in section 5-01.5.11 of the Technical Standards Manual. Tree plantings are not permitted in El Paso Gas Easements or under overhead power lines. 5. Trees shall be placed a minimum of ten feet from the center of the tree trunk to any enclosed structure. 6. Trees shall be placed a minimum of five feet from the back of the sidewalk or curb. If this standard cannot be met, then root barriers are required and must be illustrated on the submitted construction plans. 7. Trees must be planted in a six-to-nine-inch depressed planting area of at least 50 square feet (four-foot radius, or alternatives as proposed) and at least ten feet away from a building foundation. 8. Existing, established trees on property, at least 4 inches trunk diameter at chest height, located at least ten feet from the foundation or with an unobstructed dripline at maturity, shall count toward this requirement. The root systems of existing trees used for this requirement must be protected from soil compaction during construction using perimeter protective fencing around the dripline. Established trees are not required to have a depressed planting area. Existing shrubs and vegetative groundcovers may also be used toward the required landscaping. C. Vegetation shall be established, maintained, and sustained throughout its life in support of the City’s tree count, climate, and walkability goals. One of the following two options may be used: 1. Drip or bubbler irrigation with backflow protection. A simple irrigation system can be part of the domestic water supply for the residence. 2. Alternate methods, such as rainwater harvesting, hand watering, and greywater systems, as proposed by the property owner and approved by the PDSD Landscape Architect. D. Example Site Plan with Landscape Graphics, etc. https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/plan-samples/full-site-plan_feb2026.pdf 2. COMMENT: The site plan provided is incomplete. Provide a site plan that meets the requirements show in the plot plan example at the following link: https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/plan-samples/full-site-plan_feb2026.pdf Specifically: A. Provide Middle Housing landscape graphics and associated notes. 3. COMMENT: Per the City of Tucson Inclusive Home Ordinance 10463: all new dwellings have a requirement to provide an “accessible route from public and common areas, including, but not limited to, a driveway or public street or sidewalk”. Draw, dimension, and label an accessible route from the driveway, sidewalk, or street to an accessible entrance. Ensure the route meets accessibility standards as articulated in Sections 402-404 of the Accessibility Standards. See also TSM 7-01.4.3 for specifications, including the minimum 4ft-width, slope and permissible composition materials. Plans submitted post January 1st, 2026 – 2017 ICC A117.1 with Supplement 1 Accessible and Usable Buildings and Facilities https://codes.iccsafe.org/content/ICCA117.12017P7 4. COMMENT: Per Ordinance 12219, the rear and side yard setbacks are now 5’-0” as you have listed in the project data. Additionally, the street side yard setback along W 9th St is 10’-0”. As currently depicted, the dimension to the north, east and south do meet these standards and being a detached, habitable structure, will require an attempt to seek setback relief via a Design development Option (DDO) for the North (5’-0” and South (2’-0”) setbacks and a Board of Adjustment Variance for the east setback (1’-0”). DDO for North and South setbacks: Know this is an extra 6-week review and the neighbors within 100’-0” are made aware of this attempt to seek relief from being in the setback. Zoning will not be able to approve this permit application until the DDO is approved. This information is linked here: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration#section-3 To submit a DDO application, apply for a new sub-record under this permit at TDC Online: https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf See below for more information on the DDO process. Board of Adjustment Variance for the East setback: A board of adjustment variance will be required to permit the structure as shown on the site. See variance requirements below. Zoning cannot approve this permit until the Board of Adjustment (B/A) Variance Process is completed and approved. See below for more information on the B/A Variance process. 5. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments. Board of Adjustment application/requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. Contact for the Board of Adjustment is Mark Castro at Mark.Castro@tucsonaz.gov DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration . Note that multiple DDO’s can be submitted concurrently on the same application. To submit a DDO application, apply for a new sub-record under this permit at TDC Online. In order to get this specific review scheduled and if you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov. Zoning cannot approve the zoning review portion of the permit until the DDO has been approved. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: 1. Corrected building permit 2. Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments. 3. Resubmit ALL documents associated with this permit To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code |
||
| 04/15/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |