Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-0426-01585
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/02/2026 | Light Residential Building Review (OIP) - Standard | APPROVED | |||
| 04/03/2026 | Residential Zoning | APPROVED | |||
| 04/10/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/10/2026 | Residential Engineering | REQUIRES RESUBMIT | Permit: TC-RES-0426-01585 – Residential Solar Permit Location: 2292 N WOODS PL Review Date: 4/10/2026 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-06 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage… Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-rete… Overall, for application submittal requirements, see Administrative Manual Section 2-06 Site Engineering: 1. This property located at 2292 N WOODS PL is located entirely within a FEMA AE floodplain associated with the Tanque Verde Creek and will require a separate floodplain use permit with cost estimate. 2. The FPU permit is a separate permit that can be submitted for within the sub-records of this permit. 3. For the submission of the FPU permit, please provide a cost estimate form that will break down the total cost into separate lines, separating labor, materials/equipment, and warranties/fees associated with the project. Ensure to have company/contractor letterhead on the document for proper documentation. 4. Site Engineering will be unable to approve permit TC-RES-0426-01585 until the associated FPU permit is approved. It is recommended that the FPU permit process be started and achieve approval and issuance prior to the resubmission of this permit to ensure no project delays and review overlap. If you have any questions or concerns, please contact Joe Macaulay at: Joe.Macaulay@tucsonaz.gov |
||
| 04/01/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |