Permit Number: TC-RES-0424-02428
Parcel: 126130090

Address:
4557 E 12TH ST

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.1

Permit Number - TC-RES-0424-02428
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/24/2024 Fire New Construction NOT REQUIRED
05/20/2024 Site Engineering NOT REQUIRED
05/15/2024 Site Landscape NOT REQUIRED
05/22/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/09/2024 Residential Building REQUIRES RESUBMIT TC-RES-0424-02428
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide a separate Comment Response Letter when submitting updated plans. Facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

PROVIDE A COMPLETE PLAN SET showing all proposed alterations to the building with 2018 IRC code compliance with component sizes. The plans require sufficient detail for demonstrating an awareness of minimum building code compliance for passing all progress inspections.

Provide a response letter on separate file with submitting the updated construction plan set.

The construction plan set should show all proposed additions, repairs and alterations to the building and parcel.

Clarify if an interior space is changing from a different usage or if a building addition is proposed.

Provide a clear and concise construction plan set. Sample plans are available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits

SITE PLAN:

1. Provide a site plan showing utilities for the dwelling, R106.1.1. Show the location of all utility lines from property line to building(s) along with required alterations.
2. Show the square footage of bathroom, R106.1.1.

FLOOR PLAN:

Provide a floor plan showing each proposed room with labeled function and dimensions. Show door locations and window sizes with type identified as XO or SH. Include the identification of adjacent rooms with door or window openings leading into the proposed space. An altered bedroom requires code compliance for egress, R310. Show the location and size of the bedroom window.

STRUCTURAL PLANS:

1. A building addition requires a complete plan set showing materials and fastener sizes with 2018 IRC prescriptive compliance or provide an Arizona professional stamped plan set showing performance compliance with wind loading conditions, R301.1.

SECTIONS - DETAILS:

1. Provide a complete cross-section detail showing proposed material sizes and ratings for a building addition, R106.1.

PLUMBING PLANS:

1. Show plumbing vents (VTR) within acceptable distances from traps, P3105.1. (1 ½”-6’, 2”-8’, 3”-12’).

MECHANICAL PLANS:

1. Show bathroom (without a window) exhaust fan locations with minimum 50 CFM rating and duct to the exterior, R303.3 and M1505.

ELECTRICAL PLANS:

1. Show a bathroom receptacle with a separate 20 AMP dedicated GFCI circuit, E3703.4 and E3901.6.
2. Show at least one wall switch controlled light or outlet in bathrooms, hallways, stairways, attached garages, outdoor entrances or exits and all habitable rooms, E3903.3.

If you have any questions, please contact:
PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review

Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services
05/22/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL FROM: PDSD Zoning Review

PROJECT: TC-RES-0424-02428
4557 E 12TH ST. – R-2
Bathroom Addition (1st Review)

TRANSMITTAL DATE: May 22, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the R-2 zone (UDC 4.7.9). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6, .9, & .10.

1. Provide a residential plot plan that meets the requirements found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example, to include but not limited to:
a. A lot coverage calculation.
b. Owners name.
c. Legal description, OLIVE GROVE LOT 464.

2. Based on aerial photos there is what appears to be ramada along the north property line where the concrete slab is shown on the submitted plan, that appears sometime after 2015. Zoning was not able to find approved permits or compliance documents for this addition. Either provide approved documents or include this structure in this permit. Provide the height and perimeter yard setbacks to the post supporting this structure. It does not appear that this structure is meeting perimeter yard setbacks to the north property. Minimum setback is 6’-0’ or 2/3 the height of the exterior wall along the property line. If this structure does not meet setbacks at a minimum a neighbor’s setback must be secured. To secure this neighbor setback waiver the following statement must be provided on the plot plan and be signed and dated by the adjacent property owner(s):
My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan.

Signature: _____________________________

Date: _________________________________

If you are not able to secure the waiver than a Design Development Option (DDO) must be submitted and approved to reduce the required setback. DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. If you have questions about the DDO application or process please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
04/23/2024 PDSD Application Completeness Express REVIEW COMPLETED