Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.4
Permit Number - TC-RES-0424-02217
Review Name: RESIDENTIAL NEW DWELLING v.4
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/18/2024 | Site Zoning | APPROVED | |||
09/18/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
08/26/2024 | Residential Building | REQUIRES RESUBMIT | TC-RES-0424-02217 2nd PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: Provide a response letter on separate file with submitting the updated construction plan set. A building with roof projections is not appropriate for placement within 2 feet to a neighboring property line. A building with windows facing the property line is not appropriate for placement within 3 feet to a neighboring property line. GENERAL COMMENTS : 1. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one-story dwelling. Additional gray fixture drains are optional. Show a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations. Remove the inappropriate (food prep sink) gray water line and detail from the plumbing plan. PLANS: 1. The structure may not extend to a point closer than 3 feet from the adjoining (neighboring) property line without fire rated protection for fire spread. Provide compliance with R302.1 (City of Tucson Amended) by moving the dwelling placed within 3 feet to the property line or provide a complete wall barrier with not less than one-hour fire-resistive construction in compliance with IBC Table 721.1(2) along with removing facing windows. 2. A roof projection may not extend closer than 24” to the adjoining (neighboring) property line. Also, parts of a roof projection extending into the 3-foot fire separation distance from the property line requires not less than one-hour fire-resistive construction on the underside, R302.1 (City of Tucson Amended). 3. Show compliance with R310 providing egress from the loft sleeping room with minimum net clear opening area of 5.7 SQ FT, AQ105. Add the window to the plans at an accessible location and to the schedule with the opening dimensions. ELECTRICAL PLANS: 1. Show two or more 2O AMP small appliance circuits at the kitchen countertop receptacle outlets; they may also serve the breakfast room and dining room, but not other locations, E3703.2 and E3901.3. If you have any questions, please contact: PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
08/22/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |