Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-RES-0423-04044
Parcel: 120070960

Address:
156 W LINCOLN ST

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.2

Permit Number - TC-RES-0423-04044
Review Name: RESIDENTIAL NEW DWELLING v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/09/2023 Residential Building APPROVED
10/16/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/10/2023 Site Zoning REQUIRES RESUBMIT FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: TC-RES-0423-04044
156 W LINCOLN ST Zoning R-2

TRANSMITTAL DATE:‎October 10, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
This site is located in the R-2 zone (UDC 4.7.9). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6, .9, & .10.

Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. As dimensions to design grade were not provided Zoning has added 6” to all heights to determine required perimeter yard setbacks. Wall heights for porch/carport type structures a based on a measurement from design grade to the highest point where the roof rafters sit on the beam.

COMMENT: The minimum setback to the front street perimeter property line is twenty (20) feet, Based on a wall height of 8’-6” the required street perimeter yard from the proposed porch/carport is 20’-0”, proposed street perimeter yard setback is 18’-0”.


COMMENT: The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). Based on a wall height of 9’-8” the required perimeter yard setback from the proposed carport to the west property line is 6’-6”, proposed setback is 3’-0”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback,
DDO application and requirements can be found at: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/planning-amp-zoning/2019_ddo_for_setback_and_height_udc.pdf . The completed application shall be submitted as a PDF under assigned permit number. If you have questions about the DDO application or process please contact Wyatt Berger at wyatt.berger@tucsonaz.gov or Georgia Pennington at georgia.pennington@tucsonaz.gov



If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
10/16/2023 Zoning Modifications - DDO REQUIRES RESUBMIT The Zoning Review Section has indicated that a Design Development Option (DDO) is required to reduce the front street and side perimeter yards. The DDO application and requirements can be retrieved from this link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/planning-amp-zoning/2019_ddo_for_setback_and_height_udc.pdf. Submit the DDO application as a PDF under existing building permit number TC-RES-0423-04044.

At a minimum, the submitted DDO application shall include a completed "Design Development Option Application" (page 4); a " Project Description and Applicant's DDO Request" outlining the required and proposed setbacks, why the modifications are requested, and why the modifications are compatible with the immediate neighborhood (page 5); and a signed letter of agency/authorization, if applicable (page 10).

Contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951 should you have questions about the DDO process.
09/19/2023 PDSD Application Completeness Express REVIEW COMPLETED