Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SIMPLE REVIEW v.3
Permit Number - TC-RES-0326-01141
Review Name: RESIDENTIAL SIMPLE REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/13/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/13/2026 | Light Residential Building Review (OIP) Express | REQUIRES RESUBMIT | If you have questions regarding this Review, please contact Juan Quintana at juan.quintana@tucsonaz.gov Please resubmit addressing the following comments: 1) Provide a site plan or an aerial of the property, include the address and using an arrow point to the location of the battery. 2) Provide a Three-Line Diagram, use the guide linked here for an example and best practices for this scope. https://www.greenlancer.com/post/solar-three-line-diagram Include conductor sizes (including Neutrals and Grounds), conduit size, breaker ratings, and include man. provided cables as "Man. Provided conductors" 3) Provide a copy of the Man. Specs for the Disconnect to be used to determine UL listing (disconnect must be UL 98 or 489) be sure to include the label "Energy Storage System Disconnect" 4) Provide the following labels: Directory plaque showing the location of the ESS and PV. Use the verbiage of “WARNING: MULTIPLE POWER SOURCES. DISCONNECT ALL SOURCES BEFORE SERVICING.” NEC 705.10 See SR-710 pg.16 for 2-15-1902 label 5) Prior to installation of customer interconnection facilities, customer shall submit an interconnection application to TEP for review and written approval. See the Interconnection Manual from TEP for more on their requirements and how to apply: tep.com/residential-interconnection/ Contact Construction Services and the Design Team for further guidance on their process: www.tep.com/construction-applications/ |
||
| 03/12/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |