Permit Number: TC-RES-0324-01469
Parcel: 133133750

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SOLAR v.1

Permit Number - TC-RES-0324-01469
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/11/2025 Light Residential Building Review (OIP) - Standard REQUIRES RESUBMIT Permit Review TC-RES-0324-01469 (7572 E BOOKMARK PL TUCSON, AZ 85715)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Residential Code (IRC), 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. TEP typically does not allow 2 DG meters, the two systems will need to be combined to go through one DG meter. Check with TEP customer service for interconnection requirements. https://www.tep.com/electric-service-requirements
2. Provide an updated plan with the two PV systems through a single DG meter and combiner.
3. Verify the backfeed breaker sizes, the line diagrams show a 50A backfeed breaker for the new system and a separate 30A for the existing system.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
02/12/2025 PDSD Application Completeness Express REVIEW COMPLETED