Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SIMPLE REVIEW v.1
Permit Number - TC-RES-0324-01457
Review Name: RESIDENTIAL SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/12/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/12/2024 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review TC-RES-0324-01457 (2750 S AIDA AV TUCSON, AZ 85730) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC). City of Tucson code amendments to 2018 IRC: o Add new Section N1104.2.2 (IECC R 404.2.2) as follows: Section N1104.2.2 (IECC R404.2.2) Documentation (Mandatory). Construction documents shall indicate the EVSE location and shall provide information on wiring methods, circuiting and electrical load calculations which demonstrate that the premises electrical system has load capacity to accommodate the EV charging load. Residential Electric Vehicle Readiness - https://www.tucsonaz.gov/pdsd/water-energy-conservation Electrical Review for EV charger: 1. The submitted plans are missing required information: a. a) wiring methods (conduit size, wire type and size), b. b) circuiting (breaker size) and c. c) electrical load calculations which demonstrate that the premises electrical system has load capacity to accommodate the EV charging load (Include the EV charger in the load calculations as a continuous use item). See 2018 IRC E3704.2. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 03/12/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |