Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-0324-01402
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/09/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/21/2024 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review TC-RES-0324-01402 (8930 E BEARS PATH RD TUCSON, AZ 85749) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC). 1. The maximum backfeed to a 400A bus with a 400A MSB is 80A. Show compliance with NEC 705.12(B). Provide Main Service Panel (MSP) taps in compliance with NEC 705.12; 705.12(B)(2)(3) b Busbars.) 120% bus bar rule. 2. Provide a lag-bolt connection up-lift calculation demonstrating the wind load supporting capability, or provide an engineer’s calculation, and sealed design, R301.1, R324.4. An IRC PV roof uplift calculator (XLS) is available on Pima County’s website. https://www.pima.gov/1069/Solar-Wind-Systems Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 04/09/2024 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Lianne Evans at lianne.evans@tucsonaz.gov if you have any questions about the FUP. |
||
| 03/11/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |