Permit Review Detail
Review Status: Approved
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-0223-02560
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/07/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: TC-RES-0223-02560 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved 1. Solar panel mounting and anchorage to be as described in the licensed engineer’s structural analysis. Maximum panel support spacing no greater than 72 inches on center. Minimum 5/16 inch diameter lag screws with a minimum 2- 1/2 inch embedment required at each connection. BUILDING REVIEW COMMENTS: Conditionally Approved 1. Existing Rolled roofing to be replaced with composite shingle roofing as indicated on PV-2.0 2. Roof penetrations shall be flashed in accordance with IRC R324.4.3 MECHANICAL REVIEW COMMENTS: N/A ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: N/A If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 02/23/2023 | Light Residential Building Review (OIP) | APPROVED | ELECTRICAL REVIEW 1. Show a complete calculation for determining OCPD and conductor requirements. AC Overcurrent Protective Device and Conductor Sizing for PV source Circuits and Module Interconnection Conductors (Imax x 1.25) Reference NEC 690.8(A)(3) and (B)(1). 2. Show a complete calculation for determining conductor sizing. Maximum conductor ampacity is determined by applying correction and adjustment factors for temperature of insulation rating of 90C and CCC proximity. Reference NEC 310.15, Table 310.15(B)(2)(a), 310.15(B)(2)(b) and 310.15(B)(3)(a). The adjusted conductor rating may not be less than the calculated Conductor Sizing. Show a complete calculation for determining conductor sizing. |
||
| 02/23/2023 | Bldg Permits - Post Review Express | REVIEW COMPLETED | |||
| 02/03/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |