Permit Number: TC-RES-0125-00611
Parcel: 11203294B

Address:
2560 E ROSS PL

Review Status: Requires Resubmit

Review Details: RESIDENTIAL NEW DWELLING v.3

Permit Number - TC-RES-0125-00611
Review Name: RESIDENTIAL NEW DWELLING v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/23/2025 Residential Building - Standard APPROVED
04/24/2025 Site Zoning - Standard APPROVED
04/24/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/23/2025 Site Engineering - Standard REQUIRES RESUBMIT TC-RES-0125-00611
2560 E ROSS PL

This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP) and building Elevation Certificate. Please start the FUP process at our permit application web page: https://tdc-online.tucsonaz.gov/#/home.

New construction buildings require a finished floor elevation (FFE) one foot above the base flood elevation (BFE). Based on available data the BFE for this site is 2389.63 ft. NAVD88 requiring an FFE of 2390.63 ft. Show the FFE on the site plans for the floodplain use permit and the resubmittal for this building permit.

Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”

Chris Arrington chris.arrington@tucsonaz.gov
03/26/2025 PDSD Application Completeness Express REVIEW COMPLETED