Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.1
Permit Number - TC-RES-0125-00584
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/03/2025 | Light Residential Building Review (OIP) - Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-RES-0125-00584 ADDRESS/PARCEL: (914 E DRACHMAN ST TUCSON, AZ 85719) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Please correct the arrays. a. The Attachment Layout (PV 5.1) and Uplift Calculation (PV 5.2) sheets show 3 arrays, and the Electrical One Line Diagram (PV 2.1) and Systems Labeling Details (PV 2.2) sheets show only 2 arrays/strings. 2. Attachment Layout sheet (PV 5.1) - Please make sure the point load calculations table for each array matches the array shown in the diagram. For example, the table for Array 2 shows four modules, but in the diagram it shows a group of three modules. |
||
| 03/04/2025 | Site Engineering - Standard | REQUIRES RESUBMIT | TC-RES-0125-00584 914 E DRACHMAN ST This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown and include the cost of materials and labor. It may not be a leasing document. Chris Arrington chris.arrington@tucsonaz.gov |
||
| 01/31/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |