Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0125-00323
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/07/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/24/2025 | Residential Building - Standard | REQUIRES RESUBMIT | TC-RES-0125-00323 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2018 IRC with amendments and building ordinances for all dwellings. Provide a response letter addressing each comment with location of change on the plans. Submit separate letter and plan set files. Combine the two construction plan sets into one file. GENERAL COMMENTS : 1. A special inspection request is required with the updated plans for the post-tensioned slab, R109.2. 2. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. 3. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. 4. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Provide gray drain-line discharge of all second story bathing fixtures through an exterior-wall drop for future gravity distribution. Include an aliened purple colored 2” or 3” vertical drop to a cleanout cap 2’ above grade. Use the appropriate details at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations SITE PLAN: 1. Provide a site plan showing the location and size of buildings, utility meters and gas, water, electric and sewer or septic lines from property line to building, R106.1.1. Show the location of sewer HCS coordinated with Pima County Wastewater, R106.1.1. https://www.pima.gov/1766/Wastewater-Reclamation Include the water meter. Note the electrical line as underground unless overhead is approved by TEP. https://www.tep.com/construction-applications/#apply PLANS: 1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/Departments/Planning-Development-Services |
||
| 03/07/2025 | Site Engineering - Standard | REQUIRES RESUBMIT | TC-RES-0125-00323 1851 W SPEEDWAY BL 1. See zoning comments. 2. Northern 2/3 of parcel in a floodplain. Floodplain Use Permit may be required. Chris Arrington chris.arrington@tucsonaz.gov |
||
| 03/05/2025 | Site Zoning - Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-RES-0125-00323 1851 W SPEEDWAY BL. – R-1 New SFR (1st Review) TRANSMITTAL DATE: March 5, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the R-1 zone (UDC 4.7.8). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.5 – 9. 1. Provide a residential plot plan that meets the requirements found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example. 2. Clearly demonstrate that the requirements of UDC Article 7.4.6.K.A.2 are met for the proposed 20’ access. The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 02/04/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |