Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SIMPLE REVIEW v.1
Permit Number - TC-RES-0125-00316
Review Name: RESIDENTIAL SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/17/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/17/2025 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review TC-RES-0125-00316 (3524 N TREAT AV TUCSON, AZ 85716) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC). Tankless Water heater review: Clarify if this is a gas or electric unit. >>> If the Tankless Water heater is gas: 1. Modifications and additions to the gas line require that the existing system be enlarged to meet the total demand based on the new length and load, G2412.3, G2412.4. The gas Tankless water heater adds additional load to the system. 2. Provide a complete gas piping template showing the connection and length from the meter to all attached appliances, G2401.1, R301.1: Include pipe size, type (Black Iron, Poly) and length. Provide appliance demands, G2413.4.1. 3. Size the pipe based on the length from the meter to the farthest attached appliance and max total demand of all attached appliances using Table G2413.4(1) (Metallic Pipe), Table G2413.4(7) Polyethylene Plastic Pipe. Note: The length is measured from the meter to the furthest attached appliance for all sizing, G2413.4.1. >> If the Tankless Water heater is electric: 4. Include electrical circuiting information for the new Electric Tankless Water heater, including breaker size, conductor type and size. Provide the main panel rating. 5. For a Main service panel under 200A rating, provide electrical load calculations to show the existing electrical equipment can support the additional load. HVAC Review: 6. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J. >> Include the required Cooling Equipment in accordance with the Manual S. >> Include Manual D sheets for updated or modified duct work. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 01/17/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |