Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SOLAR v.2
Permit Number - TC-RES-0125-00208
Review Name: RESIDENTIAL SOLAR v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/28/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/28/2025 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | ACTIVITY NO. TC-RES-0125-00208 ADDRESS/PARCEL: (3363 N STONE AV TUCSON) The structure (Patio) that the solar permit is requesting to build on is an illegal structure and cannot legally have solar installed on it until that initial permit for the patio is resolved. Please coordinate with the customer in order to resolve this issue with the Development Services department. If you would like any more information or have any questions please leave a call back number with the email below. Should you have any questions about these comments, I can be reached at Zane.Aouane@tucsonaz.gov |
||
| 02/12/2025 | Site Engineering | REQUIRES RESUBMIT | TC-RES-0125-00208 3363 N STONE AV Site engineering comments are as follows: 1. This project is within a regulated floodplain, Navajo Wash, and requires a Floodplain Use Permit (FUP). Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: A cost estimate of materials and labor from your contractor in the form of a pdf attachment will be required to complete the FUP application. Please have separate lines for cost of materials, and cost of labor. Thank you. Ryan Insalaco – ryan.insalaco@tucsonaz.gov |
||
| 02/28/2025 | Site Engineering - Standard | REQUIRES RESUBMIT | TC-RES-0125-00208 3363 N STONE AV Site engineering comments are as follows: 1. Please see the comments on the associated Floodplain Use Permit, TE-FPU-0125-00017. This proposed project will constitute a Substantial Improvement, meaning that the cumulative cost of improvements over the last 10 years exceeds 50% of the estimated value of the structure. This will require that the structure be brought to current FEMA standards for its location. The cost estimate for this proposed solar project is $ 38,289.96 which constitutes a 65% improvement. This does not include any warranties. The 10-yr cumulative improvement percentage is 110%. Ryan Insalaco – ryan.insalaco@tucsonaz.gov |
||
| 01/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |