| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/13/2024 | Site Engineering | NOT REQUIRED | |||
| 02/16/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/01/2024 | Residential Building | REQUIRES RESUBMIT | TC-RES-0124-00353 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. SITE PLAN: 1. Show the location and size of buildings, utility meters and gas, water, electrical, and sewer, R106.1.1. Each dwelling requires an appropriate source of electrical and water supply. Show the location and size of lines with connection points, R106.1.1. Identify the utility lines requiring upgrade or replacement. PLANS: 1. Notate a cool (white) roof finish as required by the ADU provisions. 2. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include all threshold conditions for a route from the exterior into the living space. Update the Foundation Plan sheet A-4. SECTIONS - DETAILS: 1. Show an unvented roof assembly with all insulation at the roof including an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing as part of the total insulation requirement, R806.5 or show the attic vent opening size using 1 to 150 of attic area with insulation at the ceiling in compliance with R806.2. Update the Detail #3 sheet A-6. PLUMBING PLANS: 1. Tucson Water Department limits flow rates for each water meter size in compliance with P2903.7. Show an appropriate yard pipe for supporting the existing and proposed dwellings and show an appropriate water meter size. MECHANICAL PLANS: 1. Show dryer vent size and location for venting to exterior, M1501. ELECTRICAL PLANS: 1. TEP may require the service panel for the property at the closest building to the service transformer. A service line change or a new meter location must be coordinated with TEP for approval. Show an underground feeder from a metered service panel to the more distant dwelling. 2. Refer to Table E3705.5.3 for sizing branch circuit conductors and protection ratings. Update circuit #1/3, 24 & 28. 3. Interior 15A & 20A circuits serving outlet locations (except garage, kitchen, and bathrooms) including receptacles, lights, and smoke detectors require combination type arc-fault circuit interrupters, E3902.16. 4. Show an appropriate Electric Vehicle circuit size. Typically a 40 ampere 240 volt dedicated branch circuit is required with a NEMA 14-50R receptacle. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. If you have any questions, please contact: PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
| 02/16/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: Wyatt Berger Lead Planner PROJECT: TC-RES-0124-00353 940 North Longfellow Avenue – R-1 ADU, garage addition, and rebuild of rear perimeter wall (1st Review) TRANSMITTAL DATE: February 16, 2024 Please resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed. The following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). 1. Per Tucson Unified Development Code (UDC) 6.6.2.I, the maximum height of a wall or fence within a perimeter yard shall be six feet; however, the wall or fence may be higher than six feet, but no higher than ten feet, if at least 75% of the area above six feet in height is left unobstructed and open through the use of architectural elements, such as arches, columns, or wrought iron. A Design Development Option (DDO) will be required to allow the proposed rear perimeter wall to be constructed at a height of 8’-0”, unless the wall can maintain a minimum perimeter yard of 6’-0” as measured from the east lot line (UDC Table 6.3-2.A). The DDO application and requirements can be found here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/planning-amp-zoning/2019_ddo_for_setback_and_height_udc.pdf. The DDO shall be submitted under existing permit number TC-RES-0124-00353. Contact Georgia.Pennington@tucsonaz.gov if you have questions about the DDO process. 2. Two motor vehicle parking spaces are required for the principal use (UDC Table 7.4.4-1). In addition to parking required for the principal use, one parking space shall be provided for the accessory dwelling unit. The parking requirement may be satisfied with available on-street parking or waived if the site is within ¼ mile walking distance of a transit stop or an enhanced bike route as listed in the Bike Boulevard Master Plan (UDC 6.6.3.B.2). Show the location of the parking space required for the ADU as on-street parking or demonstrate that the site is within ¼ mile of a transit stop or an enhanced bike route. 3. The lot size provided (10,118 square feet) is only an estimate based on available Geographic Information Systems information. Indicate the correct lot size to determine the maximum size of the ADU. Per UDC 6.6.3.B.5, for lots equal to or greater than 6,500 square feet, the accessory dwelling unit is limited to 10% of the lot size, not to exceed 1,000 square feet of gross floor area. 4. Clarify whether the loft space is included within the 768 square foot calculation provided on the cover sheet. The storage room is included with the total gross floor area of the ADU. 5. Perimeter yards are based on a measurement from the design grade elevation to the highest point of an exterior building wall (UDC 6.4.5.B and Figure 6.4.5-A). Based on a wall height of 21’-6” as measured from design grade to the highest point of the parapet, the required side perimeter yard is 14’-4”. The proposed side perimeter yard is 3’-0”. Based on a wall height of 10’-0” as measured from design grade to the highest point of the parapet above the garage, the required side perimeter yard is 6’-6”. The proposed side perimeter yard is 3’-0”. Based on a wall of 21’-6” as measured from design grade to the highest point of the parapet, the required rear perimeter yard is 14’-4”. The proposed rear perimeter yard is 12’-0”. A DDO may also be utilized to reduce the required side and rear perimeter yards. The DDO required for the rear perimeter wall may be included within the DDO application to reduce the required setbacks. Contact Georgia.Pennington@tucsonaz.gov if you have questions about the DDO process. If you have any questions about this transmittal, contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. |
||
| 01/24/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |