Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0123-02381
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/29/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/29/2023 | Residential Building | REQUIRES RESUBMIT | TC-RES-0123-02381 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS : 1. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Property with 200 to 400 SF of available distribution area requires piping for one gray water fixture. Notate “Gray water provision not required when property has less than 200 SF available for gray water distribution” if appropriate for this property. 2. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space or show the distance from transit or a bike boulevard as not greater than a quarter-mile. PLANS: 1. Individual dwelling units require separation with a 1-hour fire-resistance rated assembly compliant with 703.3 of the 2018 IBC. Update the notation with “Type X” 5/8” gypsum board at Wall Type E, sheet A2.1. 2. Provide a column foundation (sheet S2.0) for each column on sheet S2.1 including C3 supporting B4. MECHANICAL PLANS: 1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation, or controlled exhaust with a calculated airflow rate, R303.4; N1103.6 & M1505.4. Show the system and appropriate flow rate setting on the plans. A four bedroom dwelling of 1501 – 3000 SF requires a 75 CFM continuous setting. ELECTRICAL PLANS: 1. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready” and locate the receptacle at a parking area, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen (520) 837-4912 PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
03/02/2023 | Site Landscape | REQUIRES RESUBMIT | Comments: 1. Due to the number of parking spaces required, this site is not exempt from the following. Ensure the required number of trees is in all vehicular parking areas (1 tree: 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a. 2. Provide a landscape plan for the above. |
||
03/22/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-RES-0123-02381 114 N CHERRY AV Zoning R-2 TRANSMITTAL DATE:March 22, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: Zoning has reviewed the building plan for compliance with TD-DEV-1222-00088. Zoning cannot approve the building plans until the DP is approved. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. Additional comment may be forthcoming. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
03/23/2023 | Fire New Construction | REVIEW COMPLETED | |||
03/01/2023 | PDSD Application Completeness | REVIEW COMPLETED |