| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/27/2023 | Site Engineering | NOT REQUIRED | |||
| 02/08/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/08/2023 | Residential Building | REQUIRES RESUBMIT | 3. Show an unvented roof assembly with all insulation at the roof including an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing as part of the total insulation requirement, R806.5. | ||
| 02/02/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: Wyatt Berger Lead Planner PROJECT: TC-RES-0123-02075 3333 N El Burrito Av – R-1 Detached sleeping quarters and carport (1st Review) TRANSMITTAL DATE: February 2, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. The site is in the R-1 zone (UDC 4.7.8). A single-family residence is a permitted use in the R-1 zone, subject to use-specific standards 4.9.7.B.5-.9. 1. Provide a floor plan of the existing residence demonstrating compliance with UDC 4.9.7.B.7. For any new single-family dwelling in the R-1 zone with five bedrooms, three parking spaces are required. For every bedroom over five, on additional space is required for each bedroom. For all single-family dwellings in the R-1 zone with five or more bedrooms, all parking spaces must be located on-site, either in a side or rear perimeter yard. Parking spaces may not be located in a vehicular use area in any front street perimeter yard. A parking area is not required to be developed to a commercial standard. A dustproof parking surface is required to be at least a minimum of two inches of compacted pea gravel. An existing covered residential parking area may be used. 2. Provide documentation for the solar panels installed on the residence as the Zoning Review Section was unable to determine whether a permit was obtained. The solar panels appear in aerial photography beginning in March of 2022. 3. Demonstrate on the site plan where vehicular ingress and egress for the proposed carport is located. Update the lot coverage calculation to reflect the new vehicular use area. 4. Per Unified Development Code Table 6.3-2.A, when a residential use is adjacent to a residential zone, the required side and rear perimeter yards are six feet or 2/3 the height of the proposed building wall, whichever is greater, measured from the property lines. Based on a wall height less than 9’-0”, the required setback from the west property line is 6’-0”. Provide a setback dimension from the building wall to the west property line with your next submittal. As the proposed setback appears to be less than 1’-0”, a Board of Adjustment variance is required to be granted to allow a setback less than 1’-0”. Contact Mark Castro at Mark.Castro@tucsonaz.gov should you have questions regarding the variance process. 5. Based on a wall height of 10’-10”, the required setback from the north property line is approximately 7’-2”; proposed is 6’-6”. If a variance is pursued, the variance process may allow you to reduce this setback as well. If a variance is ultimately not pursued, Design Development Option (DDO) approval is required to allow for a reduced setback. Contact Mark Castro at Mark.Castro@tucsonaz.gov should you have questions regarding the DDO process. 6. Provide a setback dimension for and maximum height of the 100 square feet existing storage to the south property line. 7. Further Zoning review comments may be forthcoming with your next submittal. If you have any questions about this transmittal, contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. |
||
| 02/02/2023 | Zoning Modifications - Variance | REQUIRES RESUBMIT | Zoning has identified an item that would require a variance. A Board of Adjustment Variance is processed in accordance with UDC Section 3.10.3. As such, a pre-application meeting and neighborhood meeting is required prior to the submittal of an application. To request a pre-application meeting, please apply for "Pre-Application Conference" at TDC Online under your permit #. If you have questions, you can email me at Mark.Castro@tucsonaz.gov | ||
| 01/17/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |