Permit Number: TC-MDP-1224-01367
Parcel: 126070580

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-1224-01367
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/18/2024 Fire New Construction NOT REQUIRED
01/12/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/26/2024 Residential Building REQUIRES RESUBMIT Permit Review TC-MDP-1224-01367 (3934 E ELMWOOD ST TUCSON, AZ 85711)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC).

>>> Appeal to the Building Official required:
1. Each dwelling requires an independent sewer connection from the dwelling to the Pima County sewer connection. 2018 IPC 701.3. A joint sewer agreement between the 3 parcel requires an appeal to the building official for approval.
2. File a Building Code Appeal under sub records of each permit.
https://www.tucsonaz.gov/Departments/Planning-Development-Services/PDSD-Sandbox/Building-Code-Modification-Appeals
3. Provide the Joint Sewer Use Agreement between the three parcels in the appeal, that has been recorded with Pima County and includes the recorder’s number.
4. Include all three address’ that are associated with the Joint sewer agreement on the appeal permit.

>>> Plumbing review.
5. Provide elevation measurements for Next Upstream Manhole cover and Finished Floor Elevation. Provide Backwater valve protection as required.
Backwater valve protection:
https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/building-code/2018_-_irc_amendments.pdf Section P3008.1 Where required. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole cover in the sewer, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor.
6. Provide 5’ Separation of water service and building sewer lines through the easement, per P2906.4.1.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
01/12/2025 Site Engineering REQUIRES RESUBMIT Development Package required. Building official approval required prior to acceptance of shared sewer connection.
Joshua Garcia
joshua.garcia@tucsonaz.gov
12/24/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Ramiro Olivarez
PDSD Zoning Review

PROJECT: TC-MDP-1124-01366 & TC-MDP-1224-01367
3934 & 3942 E ELMWOOD ST | R-3 Zone
New SFR (1st Review)

TRANSMITTAL DATE: 12/24/2024

This site is located in the R-3 zone (UDC 4.7.9). A Duplex is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10.

Per discussion with Management, the following comments have been made.

1. Comment: The parcels at 3934, 3938, and 3942 E Elmwood St meet the Unified Development Code definition of a site:

"The land area consisting of a portion of a lot, an entire lot, or contiguous lots, not including dedicated public property, designated for development as a single entity."

The site plan depicts three contiguous lots sharing an access point. A Development Package is required. The Development Package must be approved before the building permit application can be completed by zoning. Please submit a comment response letter to this building permit as it requires a resubmittal. Indicate in your response that an approved Development Package has been obtained. A complete review will be done once a Development Package has been obtained and approved.

2. Comment: The easement dimension width does not match the easement dimension found as approved on the Final Plat TD-DIV-1123-00128. The pedestrian circulation sidewalk should be constructed within the easement, not over the driveways for safety purposes.

3. Comment: At this time Zoning cannot approve this building permit application until the Development Package has been approved.

4. Comment: Additional comments may be forthcoming on the next review based on the proposed use and applicable use specific standards.

If you have any questions about this transmittal, please contact Ramiro Olivarez at Ramiro.Olivarez@tucsonaz.gov
12/17/2024 PDSD Application Completeness Express REVIEW COMPLETED
12/23/2024 ROW Engineering Review REVIEW COMPLETED ROW comments - Driveway design per PAG 206 standards, Sidewalk design per PAG 200 standards. Construction work within City of Tucson Right of Way to require individual ROW permits.