Permit Number: TC-MDP-1223-01878
Parcel: 118122710

Address:
226 E 25TH ST

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2

Permit Number - TC-MDP-1223-01878
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2024 Residential Building APPROVED
01/04/2024 Site Engineering APPROVED
01/04/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/26/2023 Site Zoning REQUIRES RESUBMIT FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: TC-MDP-1223-01878
236 E 25TH ST Zoning R-2
SFR

TRANSMITTAL DATE:‎December 26, 2023


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1.COMMENT: The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). Based on a wall height of 9’-6” the required perimeter yard setback from the proposed SFR to the west property line is 6’-4”, proposed setback is 6’-0”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback,
DDO application and requirements can be found at: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/planning-amp-zoning/2019_ddo_for_setback_and_height_udc.pdf . The completed application shall be submitted as a PDF under assigned permit number. If you have questions about the DDO application or process please contact Wyatt Berger at wyatt.berger@tucsonaz.gov or Georgia Pennington at georgia.pennington@tucsonaz.gov

If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
12/27/2023 Fire New Construction REVIEW COMPLETED
12/21/2023 PDSD Application Completeness Express REVIEW COMPLETED
12/26/2023 ROW Engineering Review REVIEW COMPLETED No new construction is proposed in Right-of-Way.