Permit Number: TC-MDP-1125-00727
Parcel: 115180910

Address:
427 W MABEL ST

Review Status: In Review

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-1125-00727
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
12/10/2025 Residential Zoning APPROVED
12/04/2025 Fire New Construction NOT REQUIRED
N/A Bldg Permits - Post Review Express PENDING ASSIGNMENT
N/A ROW Engineering Review PENDING ASSIGNMENT
12/04/2025 Residential Building REQUIRES RESUBMIT Provide a site plan showing the proposed utility connections, R106.1.1.
12/09/2025 Residential Engineering REQUIRES RESUBMIT Permit: TC-MDP-1125-00727
Location: 427 W MABEL ST
Review Date: 12/9/2025
A Comment Response letter is required. Please address all reviewer’s comments in a separate document with all required documents for resubmittal.

Residential Engineering Comments:
1. This project/site resides within Mabel Street FP and will require the submission and approval of a floodplain use (FPU) with Elevation Certificate permit. The calculated finished floor elevation (FFE) will be required for floodplain compliance. The FPU permit is a separate permit that shall be submitted within the "Sub-Records" tab of this associated building permit through TDC online.
2. For newly constructed buildings located within delineated floodplains or potential flood hazard zones both designated and undesignated, an intermediate and final elevation certificate must be filled out by a registered land surveyor and submitted to the associated FPU permit. The intermediate is to be completed PRIOR to pouring the foundation. The final is completed after construction is completed.
i. It was found that the base flood elevation (BFE) for the proposed structure is 2357.0-FT NAVD 88. This will require a minimum finished floor elevation (FFE) of 2358.0-FT NAVD 88.
ii. For the submission of the FPU permit and resubmission of the building permit, submit the construction plans with a general note that states, “Duplex to be built to a FFE of 2358.0-FT.”
3. All new construction in flood prone areas shall be accompanied by conceptual grading plans prepared by a state-registered professional civil engineer, submitted as a development package "Grading Plan" for approval by the city. City of Tucson Floodplain Ordinance - Section 26-8.b.3: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Refer here for all grading plan specifications and requirements relating to floodplain designation.
4. Residential Engineering will be unable to approve permit (TC-MDP-1125-00727) until the associated FPU permit and Development Package (Grading Plan) is approved, and the elevation certificate process has begun.
5. Show all existing driveways and curb cuts and provide dimensions. Missing curb cuts along N Acuna St.
6. Per the City of Tucson Inclusive Home Design Ordinance: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/inclusivehomedesignordinance.pdf, all new dwellings have a requirement to provide an “accessible route from public and common areas, including, but not limited to, a driveway or public street or sidewalk”. Draw, dimension, and label an accessible route from the driveway, sidewalk, or street to an accessible entrance. Ensure the route meets accessibility standards as articulated in Sections 402, 403, & 404 of the ADA Accessibility Standards: https://www.access-board.gov/ada/chapter/ch04/

If you have any questions or concerns, please contact Dylan Molina.
Dylan.Molina@tucsonaz.gov
12/11/2025 TW New Development Review Fast REQUIRES RESUBMIT Based on the information provided, Tucson Water New Area Development (NAD) has objections to, and the following comments on, the proposed development. Provide a site plan showing the proposed water connections and clearly identify the existing water meter serving this parcel.
12/03/2025 PDSD Application Completeness Express REVIEW COMPLETED