Permit Number: TC-MDP-1123-01738
Parcel: 11452008H

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1

Permit Number - TC-MDP-1123-01738
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/14/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/14/2025 Site Prep Inspection (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-MDP-1123-01738
ADDRESS/PARCEL: (9125 E CATALINA HY Unit:BLDG 78 TUCSON, AZ 85749)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter.
COMMENTS:
1. Please provide the Soils / Earthwork field report
2. Please resubmit
03/14/2025 Special Inspection Certificate Review (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-MDP-1123-01738
ADDRESS/PARCEL: (9125 E CATALINA HY Unit:BLDG 78 TUCSON, AZ 85749)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter.
COMMENTS:
1. Please provide the Soils / Earthwork field report
2. Please resubmit
03/14/2025 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED
03/13/2025 PDSD Application Completeness Express REVIEW COMPLETED
03/14/2025 Post-Tension Inspection (Deferred Submittal) Express REVIEW COMPLETED
03/14/2025 Truss Design (Deferred Submittal) Express REVIEW COMPLETED