Permit Review Detail
Review Status: Requires Resubmit
Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Permit Number - TC-MDP-0924-01031
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/20/2025 | Residential Building | APPROVED | |||
| 03/05/2025 | Fire New Construction | NOT REQUIRED | |||
| 03/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/12/2025 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comments | ||
| 03/04/2025 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-MDP-0924-01031 1214 N 13TH AV. – R-2 New Duplex (1st Review) TRANSMITTAL DATE: March 4, 2025 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the R-2 zone (UDC 4.7.9). A duplex is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6, .9, & .10. 1. The property dimensions are not correct. Review the Oracle Park Addition final plat found at: https://maps-and-records.tucsonaz.gov/subdivisions/search?book=04&pg=061, and provide the correct dimensions. 2. Clarify where the dimension, 13’-0” provided from the face of curb to the west property line came from. Per Construction Plan I-77-033 the distance should be 15’. The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 02/19/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 02/20/2025 | ROW Engineering Review | REVIEW COMPLETED | DTM Review is complete. Any work to be perform with in Right of Way or Utility connections will required separate and individual ROW permits.. |