Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-MDP-0923-01549
Parcel: 129080580

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL PERMIT - SUBDIVISION v.1

Permit Number - TC-MDP-0923-01549
Review Name: SITE FROM MODEL PERMIT - SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/11/2023 Site Engineering APPROVED
10/11/2023 Site Zoning APPROVED
10/11/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/11/2023 Residential Building REQUIRES RESUBMIT Permit Review TC-MDP-0923-01549 (1452 S cherry AV)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Residential Code (IRC), 2017 National Electrical Code (NEC).

1. For Overhead Electrical service lines: Show the mast height on the electrical riser diagram providing the necessary height clearances, NEC 230.24.
a. Provide 10’ clearance above pedestrian accessible areas, 2017 NEC 230.24(B)(1)
b. Provide 12’ clearance above residential property and driveways (Voltage under 300v), 2017 NEC 230.24(B)(2)
c. Provide 15’ clearance above residential property and driveways (Voltage greater than 300v), 2017 NEC 230.24(B)(3)
2. Provide elevation measurements for Next Upstream Manhole and Finished Floor Elevation. Provide Backwater valve protection as required.
Backwater valve protection:
https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/building-code/2018_-_irc_amendments.pdf Section P3008.1 Where required. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole cover in the sewer, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
10/10/2023 PDSD Application Completeness Express REVIEW COMPLETED