Permit Number: TC-MDP-0726-00632
Parcel: 120086290

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-0726-00632
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/19/2026 Residential Building APPROVED
08/21/2026 Residential Zoning APPROVED
08/18/2026 Fire New Construction NOT REQUIRED
08/31/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/31/2026 Residential Engineering REQUIRES RESUBMIT Reviewer: John Mounsey – Engineering Associate - Residential Engineering
Reviewer Contact: John.mounsey@tucsonaz.gov

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Residential Engineering. Submit your response letter and updated plan set as two separate files.
Residential Engineering Review Comments:
1. On the site plan, include dimensions for parking and/or driveway. (width and length). [Tucson UDC 7.4.]
2. On the site plan please connect site sidewalks to the right-of-way sidewalk. [Exterior accessible route shall conform to 2017 ICC A117.1 Sections 402 and 403 and City of Tucson Inclusive Design Ordinance]

Please contact john.mounsey@tucsonaz.gov for any questions about the comments.
08/19/2026 ROW Engineering Review REQUIRES RESUBMIT Site plan: Show existing and proposed Right-of-Way features. Provide distances and dimensions for the following:
1. Driveway (PAG SD 206) Max. width for residential driveway is 20’
2.Sidewalk (PAG SD 200) Existing with min buffer - All damage/Lifted/missing panels will be required to be replaced, and will be required to maintain a Cross slope not exceeding 2% at the new driveway. Call out dimensions on Plans for Sidewalk and buffer spaces
3.Road Type: Local
4. Review DTM Chapter 25 for Driveway placement
5) Show Sight Visibility triangles for location if noted fence will stay in place per attached link. https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-12455
6. Technical Standards Manual 10-01.4.3 Concrete driveway construction up to back of sidewalk (8' back edge of pavement)
*Unused existing curb cuts shall be closed.
7) Plan to Show all Right of Way features existing and future in ROW.
8) Show utility connections/locations with dimensions ( Ex. any cuts in pavement and the location of Utility Connection point.. with dimensions)



Provided and Call out all Right of Way Features
Call out and Show Utility connection in the Road

All work within DTM Right of Way will require submission of Separate ROW permits per scope of work..
Please review for Updated DTM fees and Review process - https://www.tucsonaz.gov/Departments/Transportation-Mobility/Permits-and-Codes-Section/Rate-and-Fee-Changes
08/18/2026 PDSD Application Completeness Express REVIEW COMPLETED
08/19/2026 TW New Development Review Fast REVIEW COMPLETED TUCSON WATER HAS NO OBJECTION TO THE PROPOSED DEVELOPMENT. THE CURRENT PARCEL IS ALREADY SERVED BY AN EXISTING 5/8-INCH WATER METER (CIS METER NO. 251742300).