Permit Review Detail
Review Status: Requires Resubmit
Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Permit Number - TC-MDP-0726-00545
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/09/2026 | Residential Building | APPROVED | |||
| 07/10/2026 | Residential Engineering | APPROVED | |||
| 07/13/2026 | Residential Zoning | APPROVED | |||
| 07/23/2026 | Fire New Construction | NOT REQUIRED | |||
| 07/24/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/09/2026 | Addressing Validation | REQUIRES RESUBMIT | The address assigned to Parcel ID 116-16-0380 is 836 N ANITA AV. If this is the correct address, please update the construction plans showing this address. If this is not the correct address, please update the construction plans showing the correct address and submit a sub-records request to correct the address. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf Instructions to submit a sub-records request to update permit address: https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf |
||
| 07/24/2026 | ROW Engineering Review | REQUIRES RESUBMIT | New driveway will be required to be constructed per Driveway apron PAG SD 206, add construction note and show driveway apron. Unused curb opening will need to be closed | ||
| 07/15/2026 | TW New Development Review Fast | REQUIRES RESUBMIT | Tucson Water cannot approve the proposed development at this time. The existing water meter currently serving 825 N. Van Alstine St. crosses through the 836 N. Anita Ave. parcel. The existing meter account must first be changed to the 836 N. Anita Ave. address. Once the address change is completed, a new water meter must be obtained to serve 825 N. Van Alstine St. After this process is completed, Tucson Water can review the proposed project. | ||
| 07/09/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |