Permit Review Detail
Review Status: Requires Resubmit
Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Permit Number - TC-MDP-0625-00329
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/30/2025 | Residential Building | APPROVED | |||
| 06/26/2025 | Fire New Construction | NOT REQUIRED | |||
| 07/01/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/30/2025 | Site Engineering | REQUIRES RESUBMIT | TC-MDP-0625-00329 3945 E GLENN ST Site engineering comments are as follows: 1. This project lies within a recognized floodplain and requires a Floodplain Use Permit (FUP) with Elevation Certificate. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home Isaac Tineo - isaac.tineo@tucsonaz.gov |
||
| 07/01/2025 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-MDP-0625-00329 3945 E. Glenn St. – R-2 ADU Model Plan (1st Review) TRANSMITTAL DATE: July 1, 2025 This site is located in the R-2 zone (UDC 4.7.9). A single-family residence (SFR) with an accessory dwelling unit (ADU) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6, 8, & 9 and 6.6.3. Provide a detailed response letter with your next submittal that clearly shows how you have addressed all Zoning comments. 1. Based on Model Plan TC-MDP-0624-00720 it appears that the porch is included in the 546 SF shown under the lot coverage. Per UDC Article 6.4.3.C.1.a Roofed areas, porches, open on at least one side are not included in the calculation. 2. Show ADU #2 as not part of this permit. 3. As you are proposing 2 ADU’s on this site separate addresses are required. Contact Pima County Addressing and secure the required addresses and revise the permit to show the correct addresses. The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 06/17/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 06/23/2025 | ROW Engineering Review | REVIEW COMPLETED | E Glenn St is under pavement moratorium until March 31, 2027. No pavement cuts shown on plans for new utilities. |