Permit Number: TC-MDP-0523-01091
Parcel: 141367940

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2

Permit Number - TC-MDP-0523-01091
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/30/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/30/2024 Site Prep Inspection (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-MDP-0523-01091 ADDRESS/PARCEL: (7355 S WILMOT RD Unit:BLDG 5 TUCSON, AZ 85756) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. COMMENTS: 1. Please submit the field report for this EARTHWORK/PADCERTIFICATION special inspection. 2. Please resubmit.
09/30/2024 Welding Inspection (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-MDP-0523-01091 ADDRESS/PARCEL: (7355 S WILMOT RD Unit:BLDG 5 TUCSON, AZ 85756) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. COMMENTS: 1. Please submit the field report for this WELDING special inspection. 2. Please resubmit.
09/30/2024 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED
09/27/2024 PDSD Application Completeness Express REVIEW COMPLETED
09/30/2024 Post-Tension Inspection (Deferred Submittal) Express REVIEW COMPLETED