Permit Number: TC-MDP-0425-00233
Parcel: 126190720

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-0425-00233
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/08/2025 Site Zoning APPROVED
05/07/2025 Fire New Construction NOT REQUIRED
05/10/2025 Site Engineering NOT REQUIRED
05/10/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/08/2025 Residential Building REQUIRES RESUBMIT ACTIVITY NO. TC-MDP-0425-00233
ADDRESS/PARCEL: (4321 E EASTLAND ST)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter.
COMMENTS:
1. Please have the utility locations on the site plan match what is shown on the approved model plan (TC-MDP-0923-01495)
a. Gas meter not shown (model plan shows gas meter on east side of unit)
b. Model plan shows the sewer line on the east side of the unit
2. Also, please provide the FFE for the ADU on the site plan to determine if a backwater valve will be required.
3. Please make note on the drawing that there will be proper vertical clearance for the overhead service conductors above the new unit.
a. Conductors shall have a vertical clearance of not less than 8 feet above the roof surface. (E3604.2.1)
4. Please resubmit
04/24/2025 PDSD Application Completeness Express REVIEW COMPLETED NOTE: Addressing issue. A unit number was not specified on the site plan for the purposed ADU. A pre-issuance addressing issue condition has been placed. To satisfy the addressing condition, a resubmittal of your plan and change of address request is required to properly update this record to reflect address and the Unit. For questions: Building_Official@tucsonaz.gov
05/01/2025 ROW Engineering Review REVIEW COMPLETED No comments - Proposed work not impacting Right of Way.. Any work not shown that does impact Right of Way will required Separate ROW permit for each activity.